Data centres / Sweden
EcoDataCenter 1, Falun
OperatingSweden2 of 13 fields known
Falun, Sweden.
- Operator
- EcoDataCenter
- Owner
- Not stated
- Stage
- Operating (source, 16 November 2023)
Reported only, from a trade article: one building operating in November 2023, a second 15 MW building announced and up to 80 MW at full build-out, with no metric stated. Needs an operator source.
What we checked
- A November 2023 trade report says the Falun campus could reach up to 80 MW at full build-out across 35,000 sq m, with one building operating and a second 15 MW building announced. (source)
What we do not know yet
2 of 13 fields in a complete record are filled. Still missing:
- Owner
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.