Stage not knownEthiopia
What we checked
- The operator describes carrier-neutral connectivity, cross-connects and indirect adiabatic cooling. These are undated facility descriptions, not confirmation of current service availability or measured performance. (source)
- Raxio identifies ET1 in ICT Park in Addis Ababa, Ethiopia. (source)
- The facility page provides Get in touch and Schedule a tour enquiry routes. (source)
The operator's own ET1 facility page places the data centre inside the ICT Park in Addis Ababa. This does not establish an exact street address, parcel boundary or visitor entrance. This is a colocation enquiry route, not a GPU rental or confirmed compute offer. Current stage, capacity, certification, coordinates and available compute remain unverified.
Operate this site or have better evidence? .
- Operator
- Raxio Group
- Owner
- Not stated
- Stage
- Stage not known
- Cooling
- The operator describes indirect adiabatic cooling. Confirm the cooling arrangement and compatible rack power density for your intended equipment; this does not establish liquid-cooling support, measured PUE or water use.
- Connectivity
- The operator describes carrier-neutral colocation with fibre providers, cross-connects and separate network-entry paths. Ask which carriers and cloud connections can serve your racks, how cross-connects are ordered and what the lead time is; no specific service availability is verified here.
Ask Raxio about ET1 colocation
Source page date not stated. Use Get in touch or Schedule a tour on the facility page and specify ET1. Describe your own equipment, rack space, power, network and intended start date. Confirm the facility entrance, current services, available space and quotation directly; an enquiry is not a reservation.
Linked Raxio Group source articles: Copyright retained; no open content licence asserted. Minimal independently worded attributed identity, locality, network and cooling descriptions with ordinary operator links. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No performance guarantee, endorsement or current availability claim.
Printable community case file
Raxio Ethiopia ET1
Record checked 12 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. The operator describes carrier-neutral connectivity, cross-connects and indirect adiabatic cooling. These are undated facility descriptions, not confirmation of current service availability or measured performance. source
- Checked statement. Raxio identifies ET1 in ICT Park in Addis Ababa, Ethiopia. source
- Checked statement. The facility page provides Get in touch and Schedule a tour enquiry routes. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
3 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- PUE
- Water use
- Chips
- Certifications
- Planning reference
Checked on 12 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 12). Raxio Ethiopia ET1: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/raxio-et1-addis-ababa
BibTeX
@misc{computefinder_data_centres_raxio_et1_addis_ababa,
title = {Raxio Ethiopia ET1: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0138}},
number = {cf-dc-0138},
note = {Page last checked 12 November 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0138. Permanent link: https://computefinder.net/entity/cf-dc-0138. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/raxio-et1-addis-ababa. Page last checked 12 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0138"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>All detailed records in Ethiopia / Same recorded stage in Ethiopia
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact