PJM proposes ride-through standards for large computational loads
By ComputeFinder editorial desk
Source publication date not recorded

PJM says it wants new reliability standards requiring large loads such as data centres and crypto mining sites to stay connected through voltage and frequency disturbances. It cites a July incident in northern Virginia in which close to 4,000MW of data centre load disconnected. PJM plans to file proposed solutions with FERC in November and notes similar work at MISO, ERCOT and NERC.
Follow the implications
Inspect the connected records for their own evidence, dates and next steps.
Sources and context
PJM Inside Lines. Source rights retained.
The original evidence-review time is not recorded for this archived account. Source dates, evidence checks and publication dates are separate. A permanent page does not make an old event new.
Scope and limitations
An archived source account does not establish current availability or delivered outcomes.
AI-assisted research and editing, with source checks. Company announcements remain attributed claims. Our method · Suggest a correction · Contact the editorial desk.