ComputeFinder

Compute news

PJM proposes ride-through standards for large computational loads

By ComputeFinder editorial desk

Source publication date not recorded

Original topic illustration of power and compute.
Topic illustration of power and compute. Not a depiction of a specific site, product or event.

PJM says it wants new reliability standards requiring large loads such as data centres and crypto mining sites to stay connected through voltage and frequency disturbances. It cites a July incident in northern Virginia in which close to 4,000MW of data centre load disconnected. PJM plans to file proposed solutions with FERC in November and notes similar work at MISO, ERCOT and NERC.

Follow the implications

Inspect the connected records for their own evidence, dates and next steps.

Sources and context

PJM Inside Lines. Source rights retained.

The original evidence-review time is not recorded for this archived account. Source dates, evidence checks and publication dates are separate. A permanent page does not make an old event new.

Scope and limitations

An archived source account does not establish current availability or delivered outcomes.

AI-assisted research and editing, with source checks. Company announcements remain attributed claims. Our method · Suggest a correction · Contact the editorial desk.

Follow ComputeFinder news · Original archive link · All news