Sites: data centres and AI projects
Search the existing detailed records and Epoch AI project records together.
Coverage is partial. A missing result does not mean no data centre exists there. Operating does not establish compute available to buy.
Showing 8 source records.
| Record | Country | Organisation and role | Source-reported address | Recorded stage | Dated building evidence | Evidence type | Record date |
|---|---|---|---|---|---|---|---|
| Africa Data Centres NBO1 Nairobi | Kenya | Facility operator: Africa Data Centres; facility owner: Not recorded | Sameer Industrial Park, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Mombasa One (MBA1) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Miritini, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Mombasa Two (MBA2) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Nyali, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Digital Realty (iColo) Nairobi One (NBO1) | Kenya | Facility operator: Digital Realty (formerly iColo); facility owner: Not recorded | Karen, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| iXAfrica NBOX1 Nairobi campus | Kenya | Facility operator: iXAfrica Data Centre; facility owner: Not recorded | Cabanas, Mombasa Road, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| PAIX Nairobi (NBO-1) | Kenya | Facility operator: PAIX Data Centres; facility owner: Not recorded | Britam Tower, Hospital Road, Upper Hill, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Telkom Kenya Milimani Exchange data centre | Kenya | Facility operator: Telkom Kenya; facility owner: Not recorded | Milimani Exchange, Bishop Road, adjacent to NSSF Building, Nairobi, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
| Telkom Kenya Mombasa Telephone House data centre | Kenya | Facility operator: Telkom Kenya; facility owner: Not recorded | Mombasa Telephone House, Mombasa, Kenya (Recorded location; checked 2026-11-10; Location source) | Stage not recorded | No dated building evidence recorded here | Detailed evidence record | 2026-11-10 |
Map and country groups · Detailed evidence records · AI estimates dataset · Evidence coverage
About these records and their limits
These are 234 source records, not a complete or deduplicated world census. A campus may contain several buildings, and sources may describe different phases or the same place. A missing result does not mean no data centre exists there.
Epoch's owner field attributes AI hardware, not necessarily the facility owner or operator. Detailed records keep facility operators and owners distinct. Imported Epoch records have no whole-record lifecycle stage or sourced map coordinates in our current extraction. Separately dated building reports describe some buildings, not an entire completed campus. The building-evidence filter is independent of Recorded stage. Future projections are excluded. 80 existing records carry separately dated, source-reported address/location fields; these do not establish a building/phase identity, map coordinates or operating status. Some values are localities or plus codes rather than street addresses. Display normalises whitespace and dash typography; exported fields retain the source values. Other addresses are not recorded here, not proven absent. Stage not recorded must not be read as unbuilt. Operating does not establish compute available to buy.
Data centre, campus or AI project?
A data centre houses computing infrastructure. A campus can group buildings and shared infrastructure. AI describes the computing use, rather than a separate lifecycle stage. We retain each source's scope and do not infer a building count, operational status or available capacity from a project name.