ComputeFinder

Sites: data centres and AI projects

Search the existing detailed records and Epoch AI project records together.

Coverage is partial. A missing result does not mean no data centre exists there. Operating does not establish compute available to buy.

Clear filters

Showing 3 source records.

Matching source records
RecordCountryOrganisation and roleSource-reported addressRecorded stageDated building evidenceEvidence typeRecord date
Bridge Data Centres MY06MalaysiaFacility operator: Bridge Data Centres; facility owner: Not recordedNot recorded hereStage not recordedNo dated building evidence recorded hereDetailed evidence record2026-10-17
DayOne KempasMalaysiaAI hardware owner: Not recorded; facility operator: not recordedHP79+MP, 81300 Johor Bahru, Johor, Malaysia (Epoch source claim; checked 2026-10-17; CSV source)Stage not recordedNo dated building evidence recorded hereEpoch AI estimate2026-10-02
DayOne NusajayaMalaysiaAI hardware owner: Not recorded; facility operator: not recordedNot recorded hereStage not recorded6 operational buildings reported as of 2026-04-05 (Epoch estimate). Epoch estimates six operational buildings in its tracked Nusajaya account dated 5 April 2026; Buildings 7 to 10 still appeared mostly complete with construction work at the edges. Its later 2 October estimate relies on an expected construction and ramp schedule, not a new operational observation, and is excluded here. This tracked account does not cover every campus phase or verify current campus status, completed expansion or available compute. Checked 2026-10-15; Timeline sourceEpoch AI estimate2026-10-02

Map and country groups · Detailed evidence records · AI estimates dataset · Evidence coverage

About these records and their limits

These are 234 source records, not a complete or deduplicated world census. A campus may contain several buildings, and sources may describe different phases or the same place. A missing result does not mean no data centre exists there.

Epoch's owner field attributes AI hardware, not necessarily the facility owner or operator. Detailed records keep facility operators and owners distinct. Imported Epoch records have no whole-record lifecycle stage or sourced map coordinates in our current extraction. Separately dated building reports describe some buildings, not an entire completed campus. The building-evidence filter is independent of Recorded stage. Future projections are excluded. 80 existing records carry separately dated, source-reported address/location fields; these do not establish a building/phase identity, map coordinates or operating status. Some values are localities or plus codes rather than street addresses. Display normalises whitespace and dash typography; exported fields retain the source values. Other addresses are not recorded here, not proven absent. Stage not recorded must not be read as unbuilt. Operating does not establish compute available to buy.

Data centre, campus or AI project?

A data centre houses computing infrastructure. A campus can group buildings and shared infrastructure. AI describes the computing use, rather than a separate lifecycle stage. We retain each source's scope and do not infer a building count, operational status or available capacity from a project name.