ComputeFinder

Sites: data centres and AI projects

Search the existing detailed records and Epoch AI project records together.

Coverage is partial. A missing result does not mean no data centre exists there. Operating does not establish compute available to buy.

Clear filters

Showing 3 source records.

Matching source records
RecordCountryOrganisation and roleSource-reported addressRecorded stageDated building evidenceEvidence typeRecord date
AWS New AlbanyUnited StatesAI hardware owner: Amazon (confident); facility operator: not recorded13360 Miller Rd NW (Epoch source claim; checked 2026-10-17; CSV source)Stage not recordedNo dated building evidence recorded hereEpoch AI estimate2026-10-02
Google New AlbanyUnited StatesAI hardware owner: Google (confident); facility operator: not recorded1101 Beech Rd SW, New Albany, OH 43054 (Epoch source claim; checked 2026-10-17; CSV source)Stage not recordedNo dated building evidence recorded hereEpoch AI estimate2026-10-02
Meta PrometheusUnited StatesAI hardware owner: Meta (confident); facility operator: not recorded1 Community Cir, New Albany, OH 43054 (Epoch source claim; checked 2026-10-15; CSV source)Stage not recorded10 operational buildings reported as of 2026-08-31 (Epoch estimate). Epoch estimates ten operational buildings. Its account infers activity in some southern tents while northern structures still await power connections and Building 13 remains under construction. Five future projections are excluded; this is not verification of a completed campus or compute availability. Checked 2026-10-15; Timeline sourceEpoch AI estimate2026-10-02

Map and country groups · Detailed evidence records · AI estimates dataset · Evidence coverage

About these records and their limits

These are 255 source records, not a complete or deduplicated world census. A campus may contain several buildings, and sources may describe different phases or the same place. A missing result does not mean no data centre exists there.

Epoch's owner field attributes AI hardware, not necessarily the facility owner or operator. Detailed records keep facility operators and owners distinct. Imported Epoch records have no whole-record lifecycle stage or sourced map coordinates in our current extraction. Separately dated building reports describe some buildings, not an entire completed campus. The building-evidence filter is independent of Recorded stage. Future projections are excluded. 80 existing records carry separately dated, source-reported address/location fields; these do not establish a building/phase identity, map coordinates or operating status. Some values are localities or plus codes rather than street addresses. Display normalises whitespace and dash typography; exported fields retain the source values. Other addresses are not recorded here, not proven absent. Stage not recorded must not be read as unbuilt. Operating does not establish compute available to buy.

Data centre, campus or AI project?

A data centre houses computing infrastructure. A campus can group buildings and shared infrastructure. AI describes the computing use, rather than a separate lifecycle stage. We retain each source's scope and do not infer a building count, operational status or available capacity from a project name.