Repair, reuse and retirement evidence
Repair, reuse and retirement evidence
Three reviewed starting points distinguish guidance, a named grid-asset obligation and an operator-reported system retirement. A retirement event does not establish disposal, recovery or whole-site closure/restoration.
- Server component reuse and its practical constraints · Stage 10; Historical technical guidance.
- A grid licence requires a named line span to be removed · Stage 11; Issued grid-asset licence condition.
- Operator-reported system retirement: ASPIRE 1 · Stage 11; Operator-reported system retirement.
Certified refurbishment, secondary-GPU brokerage, municipal data-centre closure, bonds and stranded-asset liability remain unassessed here.
No completed recovery or restoration is established. Read the lifecycle questions.
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact