ComputeFinder

Data centres / Asia Pacific / Australia

NEXTDC M3 data centre campus

West Footscray, Victoria, Australia.

Stage not knownAustralia

What we checked

One campus record, not a new facility for each stage. West Footscray is the application land's locality, not a verified boundary of the whole campus. The application does not establish approval, completed construction, power delivery or available compute. Whole-campus stage, operator, owner, exact address, coordinates, capacity and service availability remain unverified. Ask NEXTDC separately about the building, service, power allocation and ready date.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Stage not known

Check M3 expansion application PA2604231
Source page date not stated. Official planning record, not an operator sales route. Check the current application and any decision with the responsible authority; the listed public-notice date is not a verified current comment window.

Linked State of Victoria, Department of Transport and Planning source articles: Source rights retained; minimal original factual register account and ordinary link, no open licence asserted for applicant material. Source: Ministerial permits register (© State of Victoria, Department of Transport and Planning), accessed 19 November 2026. Minimal original factual account, not a reproduction of the applicant's description, plans, attachments, photographs, branding, personal details or substantial source text. The department's terms exclude third-party material from its website licence; no blanket CC BY or NEXTDC-content reuse permission is inferred. No endorsement.

Planning

Planning
Decision or documentStatusDateReview
Expansion application PA2604231 (not a decision)Status not knownNot stated

Printable community case file

NEXTDC M3 data centre campus

Record checked 19 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?1 planning item recordedCheck the authority's complete file, reference and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Decision evidence. Expansion application PA2604231 (not a decision): Status not known, date not stated.
  • Checked statement. Victoria's ministerial permits register lists application PA2604231 from NEXTDC Limited. The application description concerns expanding M3, NEXTDC's data centre campus in the Tottenham Employment Precinct. source
  • Checked statement. The entry places the application land in West Footscray and records receipt on 17 February 2026 and public notice on 11 March 2026. Those dates do not establish a current comment window or an approval. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 19 November 2026. Reported and planned figures are shown as such. Independently reviewed on 19 November 2026: Minimal register-sourced campus identity, locality, application identifier and recorded dates, with application-versus-approval and availability limits. Root fetched the original; independent challenge of supplied excerpts and code, not independent source-fetch proof.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 19). NEXTDC M3 data centre campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/nextdc-m3-west-footscray

BibTeX
@misc{computefinder_data_centres_nextdc_m3_west_footscray,
  title        = {NEXTDC M3 data centre campus: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/nextdc-m3-west-footscray}},
  note         = {Page last checked 19 November 2026. Retrieved 20 November 2026.}
}

Page link: https://computefinder.net/data-centres/nextdc-m3-west-footscray. Page last checked 19 November 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in Australia

All detailed records in Australia / Same recorded stage in Australia

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact