ComputeFinder

Data centres / Morocco

N+ONE CMN campus

Casablanca, Morocco.

Stage not knownMorocco

What we checked

Operator-marketed campus identity and locality only. The CMN label is not a verified alias for a separately announced Nouaceur project, an older numbered data centre or a particular building. Read the country account at https://nplusone.africa/morocco-datacenter/ and confirm the exact site, building and delivery phase with N+ONE. Current operating stage, legal owner, precise address, coordinates, campus boundaries, capacity, power, certification, GPU stock and available compute are not verified. Source publication and update dates are not stated. Website counters and generic marketing specifications are not facility evidence and have not been transferred.

Operate this site or have better evidence? .

Operator
N+ONE Datacenters
Owner
Not stated
Stage
Stage not known

Ask N+ONE about the named campus
Source page date not stated. Use Sales Inquiries and specify the campus code and country, your workload, required service and delivery date. Confirm the actual hosting location and written availability. This is a shared operator enquiry route, not a campus address or capacity reservation. No form was submitted.

Linked N+ONE Datacenters source articles: Copyright retained; selected basic facts and ordinary links only. Minimal independently worded, attributed campus-name/locality facts and ordinary unframed operator links. The linked privacy policy concerns personal data; it is not a reuse licence. No applicable restriction defeating this precise factual/link use was identified in the inspected home, country, contact and privacy pages. No source prose, photographs, logos, maps, contact details, technical specifications or numeric counters reproduced. No open licence, endorsement, source-wide clearance or recurring monitoring authority asserted. Reassess newly evidenced restrictions.

Printable community case file

N+ONE CMN campus

Record checked 21 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. N+ONE lists CMN campus in Casablanca on its locations page. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

1 separately recorded source statement. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 21 November 2026. Reported and planned figures are shown as such. Independently reviewed on 21 November 2026: Minimal marketed identity, locality, scope distinctions and ordinary operator route only; not operation, capacity, service delivery or available compute. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 21). N+ONE CMN campus: capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/nplusone-cmn-casablanca

BibTeX
@misc{computefinder_data_centres_nplusone_cmn_casablanca,
  title        = {N+ONE CMN campus: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/nplusone-cmn-casablanca}},
  note         = {Page last checked 21 November 2026. Retrieved 23 November 2026.}
}

Page link: https://computefinder.net/data-centres/nplusone-cmn-casablanca. Page last checked 21 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in Morocco

All detailed records in Morocco / Same recorded stage in Morocco

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact