ComputeFinder

Data centres / Egypt

Raya hosting reference: New Cairo

New Cairo, Egypt.

Stage not knownEgypt

What we checked

The title is a ComputeFinder description, not a verified official facility brand. The registry names 6th of October City and New Cairo separately; these records do not establish the number or boundaries of buildings at either location. The registry page displays a last-modified date of 23 September 2026, which is not a facility opening, commissioning or operating-status date. Legal owner and operator role, exact address, coordinates, current operating stage, capacity, certification, GPU stock, charges and hosting availability remain unverified. This record makes no finding about licensing, regulatory approval or compliance and does not equate either reference with a separately proposed acquisition, Maadi location or new development.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Stage not known

Ask Raya about this named Egyptian location
Source page date not stated. Shared corporate sales-information form, not a site-specific booking or capacity reservation. Specify the locality, workload, service and intended start date, and ask Raya to identify the exact facility and hosting location. No form was submitted and no response, eligibility or available capacity was tested.

Linked Financial Regulatory Authority, Egypt; Raya Data Center source articles: Copyright retained; minimal attributed locality facts and ordinary links only. One company-name/locality association per reference, independently worded and attributed, plus an ordinary unframed official information/enquiry link. No registry table, staff contact, expiry/status, service-level data, source narrative, photograph or form content reproduced. No applicable restriction defeating this precise factual/link use was identified on the inspected registry and operator pages; the operator privacy link timed out and is not treated as a reuse licence. No open licence, endorsement, blanket domain permission or available-service guarantee asserted.

Printable community case file

Raya hosting reference: New Cairo

Record checked 22 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. Egypt's Financial Regulatory Authority hosting-company registry associates Raya Data Center with New Cairo. This is a locality-level registry reference, not an independently identified building. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

0 of 13 facility fields recorded

1 separately recorded source statement. These are not included in the facility-field count.

0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 22 November 2026. Reported and planned figures are shown as such. Independently reviewed on 22 November 2026: Registry company/locality association and shared official enquiry route only; not physical-building identity, current technical/status, regulatory clearance or availability. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 22). Raya hosting reference: New Cairo: evidence and recorded limits. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/raya-new-cairo-reference

BibTeX
@misc{computefinder_data_centres_raya_new_cairo_reference,
  title        = {Raya hosting reference: New Cairo: evidence and recorded limits},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/raya-new-cairo-reference}},
  note         = {Page last checked 22 November 2026. Retrieved 23 November 2026.}
}

Page link: https://computefinder.net/data-centres/raya-new-cairo-reference. Page last checked 22 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in Egypt

All detailed records in Egypt / Same recorded stage in Egypt

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact