Stage not knownSenegal
What we checked
- Sénégal Numérique names Diamniadio among its data-centre infrastructure, separately from Orana and Technopole. (source)
A source-named institutional facility reference, not a newly opened data centre or confirmed available compute. Diamniadio is the locality used in the institutional name; no exact building, parcel, entrance or coordinates are verified. The source describes centres as operational but its displayed article date is inconsistent with the later history in its text, so no current operating stage or source-publication date is assigned here. The institutional footer address at Technopôle, Pikine is not substituted for this facility. Legal operator, owner, capacity, certification, public eligibility and current hosting conditions remain unverified. The relationship to the separate Senegal Connect Park or PTN project is not established here.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Stage not known
Read the SENUM institutional account and its limits
Source page date not stated. Institutional information only, not a verified hosting enquiry, application or booking route. The main SENUM website is being rebuilt. Ask the institution about the appropriate route and current eligibility before assuming that hosting is available.
Linked Sénégal Numérique SA source articles: Copyright retained; minimal attributed identity fact and ordinary link. One independently worded institutional identity fact and ordinary unframed information link only. No source narrative, quotations, photographs, contacts, specification tables, capacity, utilisation, costs or security material reproduced. The inspected institutional page reserves copyright and exposes no linked reuse policy; no applicable restriction defeating this precise factual/link use was identified. No open licence, endorsement, current service guarantee or blanket domain permission asserted.
Printable community case file
Diamniadio data centre, SENUM reference
Record checked 22 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. Sénégal Numérique names Diamniadio among its data-centre infrastructure, separately from Orana and Technopole. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
0 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 22 November 2026. Reported and planned figures are shown as such. Independently reviewed on 22 November 2026: Institutional identity and named-locality reference only; not a current operating-stage, ownership, technical capacity, precise-location or available-hosting assessment. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 22). Diamniadio data centre, SENUM reference: evidence and recorded limits. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/senum-diamniadio-reference
BibTeX
@misc{computefinder_data_centres_senum_diamniadio_reference,
title = {Diamniadio data centre, SENUM reference: evidence and recorded limits},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/data-centres/senum-diamniadio-reference}},
note = {Page last checked 22 November 2026. Retrieved 23 November 2026.}
}Page link: https://computefinder.net/data-centres/senum-diamniadio-reference. Page last checked 22 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.
Other sites in Senegal
All detailed records in Senegal / Same recorded stage in Senegal
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact