- Vyoma lists BOM 01 in Panvel and markets the facility for colocation. It does not confirm space for a particular deployment. (source)
This listing describes the named facility only. It does not verify current stage, available space, exact address or usable power. Other Vyoma buildings, wider development plans and GPU services are not part of this record.
Operate this site or have better evidence? .
- Operator
- Larsen & Toubro-Vyoma
- Owner
- Not stated
- Stage
- Stage not known
Ask Vyoma about BOM 01 colocation
Source page date not stated. Use the operator’s general contact page and name BOM 01 in Panvel. Ask if your rack and power requirements can be met, when space can be supplied and what the complete quote includes. The contact page is not a booking or a verified facility address. No enquiry was submitted.
Linked Larsen & Toubro-Vyoma source articles: Copyright retained; no open content licence asserted. Minimal independently worded identity, locality, service and enquiry facts and ordinary links. No source prose, media, facility specifications, capacities or prices reproduced. No endorsement or wider reuse permission implied.
Printable community case file
Vyoma BOM 01, Panvel
Record checked 23 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. Vyoma lists BOM 01 in Panvel and markets the facility for colocation. It does not confirm space for a particular deployment. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 23 November 2026. Reported and planned figures are shown as such. Independently reviewed on 23 November 2026: Named facility, locality, advertised colocation, general enquiry and source-use limits only.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 23). Vyoma BOM 01, Panvel: capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/vyoma-bom-01-panvel
BibTeX
@misc{computefinder_data_centres_vyoma_bom_01_panvel,
title = {Vyoma BOM 01, Panvel: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0170}},
number = {cf-dc-0170},
note = {Page last checked 23 November 2026. Retrieved 23 November 2026.}
}Stable ID: cf-dc-0170. Permanent link: https://computefinder.net/entity/cf-dc-0170. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/vyoma-bom-01-panvel. Page last checked 23 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0170"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in India
- C-DAC Pune National AI Facility (PARAM Siddhi)
- PARAM Shivay (IIT(BHU), Varanasi)
- PARAM Ganga (IIT Roorkee)
- PARAM Kamrupa (IIT Guwahati)
- Yotta NM1, Navi Mumbai
All detailed records in India / Same recorded stage in India
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact