ComputeFinder

Data centres / Asia Pacific / India

C-DAC Pune National AI Facility (PARAM Siddhi)

Pune, Maharashtra, India.

Stage not knownIndia

What we checked

This is the National AI Facility context listed for PARAM Siddhi, not every C-DAC Pune system or a verified whole-campus boundary. The government records a historical system commissioning year, not a facility opening day or current operating check. PARAM Rudra Pilot and GMRT-NCRA Pune are distinct source rows and are not joined here. Precise location, facility operator and legal owner, capacity, planning, power, cooling and current public compute access remain unverified. C-DAC institutional pages could not be retrieved during this check; no administrative address or application route is assigned to the hardware. One named account does not establish Indian coverage or available compute.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Stage not known

Linked Government of India ministries, via Press Information Bureau source articles: PIB source terms, not a Creative Commons source licence. Linked government releases retain their source terms: accurate, non-misleading reproduction with prominent source acknowledgement; third-party material is excluded. This record uses two original factual accounts and links, not source passages, media, a capacity table or a full annexure. No endorsement or blanket source clearance is implied.

Printable community case file

C-DAC Pune National AI Facility (PARAM Siddhi)

Record checked 14 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. The Ministry of Electronics and IT release dated 10 December 2025 lists PARAM Siddhi at C-DAC Pune National AI Facility in Maharashtra. source
  • Checked statement. The Ministry of Science and Technology release dated 3 December 2025 records 2020 as the installed supercomputer's commissioning year at C-DAC Pune National AI Facility. This is not an exact facility opening date or a current whole-facility status check. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

0 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

0 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 14 October 2026. Reported and planned figures are shown as such. Independently reviewed on 14 October 2026: the two historical system/facility-context statements and their precise source-use limits. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 14). C-DAC Pune National AI Facility (PARAM Siddhi): evidence and recorded limits. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/cdac-pune-national-ai-facility

BibTeX
@misc{computefinder_data_centres_cdac_pune_national_ai_facility,
  title        = {C-DAC Pune National AI Facility (PARAM Siddhi): evidence and recorded limits},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0074}},
  number       = {cf-dc-0074},
  note         = {Page last checked 14 October 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0074. Permanent link: https://computefinder.net/entity/cf-dc-0074. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/cdac-pune-national-ai-facility. Page last checked 14 October 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0074"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in India

All detailed records in India / Same recorded stage in India

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact