ComputeFinder

Data centres / Kenya

Africa Data Centres NBO1 Nairobi

Nairobi, Kenya.

Stage not knownKenya

Location

Sameer Industrial Park, Nairobi, Kenya

Exact building coordinates are not recorded here.

Operator-reported industrial-park location. Exact building coordinates and a street number are not recorded here.

Location source. Source date not stated. Location evidence checked 10 November 2026.

Ask Africa Data Centres about NBO1 colocation
Source page date not stated. The official facility page includes a tour/enquiry form. Confirm rack or cage availability, power, connectivity, contract and lead time directly with the operator.

What we checked

NBO1 is the code on the current operator page. Its linked older datasheet spells the code NB01; that spelling is retained as a search alias, not a second facility. The undated page describes colocation services, but does not establish current rack availability, an opening date or a dated whole-facility operating stage. Older datasheet capacity figures are excluded.

Operate this site or have better evidence? .

Operator
Africa Data Centres
Owner
Not stated
Stage
Stage not known
Connectivity
The operator describes links to Kenyan carrier networks, regional fibre connections and routes to cable landing stations in Mombasa. Ask which carriers and routes are available for your service; this is an undated operator account, not a current connectivity test.

Linked Africa Data Centres source articles: Copyright retained; no open source-content licence asserted. ComputeFinder independently states minimal attributed identity, location and service-category facts and supplies an ordinary unframed operator link. No marketing narrative, tables, numerical specifications, certifications, images or logos copied. Not a bulk operator-directory import or a licence over the linked material. No endorsement or current availability claim.

Printable community case file

Africa Data Centres NBO1 Nairobi

Record checked 10 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. Africa Data Centres identifies its Nairobi facility as NBO1 and locates it at Sameer Industrial Park, Nairobi, Kenya. source
  • Checked statement. The operator describes colocation options including cages, racks and cross-connects, and provides a facility-tour enquiry form. source
  • Checked statement. The operator describes Kenyan carrier access, regional fibre connections and routes to cable landing stations in Mombasa. Current carrier choice, route diversity and service availability need direct confirmation. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

2 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

2 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 10 November 2026. Reported and planned figures are shown as such. Independently reviewed on 10 November 2026: Facility identities, location originals, campus reference-point conversions, source-use limits and operator next steps only; current operation, capacity and availability remain unknown.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 10). Africa Data Centres NBO1 Nairobi: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/africa-data-centres-nbo1-nairobi

BibTeX
@misc{computefinder_data_centres_africa_data_centres_nbo1_nairobi,
  title        = {Africa Data Centres NBO1 Nairobi: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0103}},
  number       = {cf-dc-0103},
  note         = {Page last checked 10 November 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0103. Permanent link: https://computefinder.net/entity/cf-dc-0103. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/africa-data-centres-nbo1-nairobi. Page last checked 10 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0103"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Kenya

All detailed records in Kenya / Same recorded stage in Kenya

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact