ComputeFinder

Data centres / Uganda

Raxio Uganda UG1

Namanve Industrial Park, Uganda.

Stage not knownUganda

What we checked

The operator identifies UG1 in Namanve Industrial Park, Uganda. This is a colocation enquiry route for your own equipment, not a GPU rental or confirmed compute offer. Historical and current rack counts differ, so capacity and certification are not admitted here. Current operating stage, available space, street address and coordinates remain unverified. Company contact addresses are not substituted for the facility location.

Operate this site or have better evidence? .

Operator
Raxio Group
Owner
Not stated
Stage
Stage not known

Ask Raxio about Uganda UG1 colocation
Source page date not stated. Use Get in touch or Schedule a tour on the Uganda facility page and select Raxio Uganda UG1. Specify your equipment, rack space, power, network and intended start date. Ask for a current quotation and confirmation of available space; an enquiry is not a reservation.

Linked Raxio Group source articles: Copyright retained; no open content licence asserted. Minimal independently worded attributed identity, locality and enquiry facts with an ordinary operator link. No marketing narrative, specification tables, PDFs, prices, images, maps or personal contacts reproduced. No endorsement or current availability claim.

Printable community case file

Raxio Uganda UG1

Record checked 12 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. Raxio identifies its Uganda UG1 data centre in Namanve Industrial Park. source
  • Checked statement. The Uganda facility page provides Get in touch and Schedule a tour routes with a Uganda UG1 selection. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 12 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 12). Raxio Uganda UG1: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/raxio-ug1-namanve

BibTeX
@misc{computefinder_data_centres_raxio_ug1_namanve,
  title        = {Raxio Uganda UG1: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0132}},
  number       = {cf-dc-0132},
  note         = {Page last checked 12 November 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0132. Permanent link: https://computefinder.net/entity/cf-dc-0132. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/raxio-ug1-namanve. Page last checked 12 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0132"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

All detailed records in Uganda / Same recorded stage in Uganda

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim