Supply chain / On-site power
Gas turbine backlogs
Trade press reported in August 2026 that Siemens Energy, GE Vernova and Baker Hughes each posted record gas turbine related backlogs, with data centre demand named as a driver.
- Type
- Reported constraint
- Where it sits
- Long turbine order books mean gas-fired on-site power for new campuses may not be available quickly, which affects site and timing choices.
- Constraint
- Figures are company-reported and relayed by Turbomachinery Magazine (6 August 2026), so they should be checked against the companies' own results.
What we checked
- Siemens Energy was reported to have a gas services backlog of 73 billion euros, with US data centre orders cited as a driver. (source)
- GE Vernova was reported to have a gas turbine backlog of 116 GW. (source)
Written by ComputeFinder from public pages on 2 October 2026. Company statements are the company's own, not independently checked, and reported items are marked as such. Not yet reviewed line by line by a second person. If something is wrong, .
Cite this page
ComputeFinder. (2026, October 2). Gas turbine backlogs: role in the compute supply chain. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/supply-chain/gas-turbine-backlog
BibTeX
@misc{computefinder_supply_chain_gas_turbine_backlog,
title = {Gas turbine backlogs: role in the compute supply chain},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-sup-0070}},
number = {cf-sup-0070},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-sup-0070. Permanent link: https://computefinder.net/entity/cf-sup-0070. It keeps working if this page moves.
Page link: https://computefinder.net/supply-chain/gas-turbine-backlog. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-sup-0070"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Others in this group
- Bloom Energy
- Wärtsilä (data centre power engines)
- Caterpillar and Hunt Energy data centre power agreement
- GE Vernova (gas turbines)
- Siemens Energy (gas turbines)
- Mitsubishi Power (gas turbine combined cycle)
More in this supply layer
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact