Data centres / Asia Pacific / Australia
Tullamarine data-centre development (PA2403452)
Tullamarine, Victoria, Australia.
Stage not knownAustralia
What we checked
- Victoria's ministerial permits register records a data-centre land-use and development permit for land in Tullamarine, with a decision dated 28 March 2025 under PA2403452. (source)
- A correction linked to that original permit records Airtrunk Mel2 Pty Ltd as applicant and a decision dated 14 August 2026 under PA2403452-1. (source)
One development-level account of the land identified in PA2403452, not a separate facility for each permit change. The correction names Airtrunk Mel2 Pty Ltd as applicant; that does not establish legal operator, owner or whole-campus boundaries. Planning decisions do not prove construction, operation, power delivery or available compute. Capacity, precise coordinates and customer access remain unverified. No AirTrunk website material or applicant plans are reused.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Stage not known
Check the Tullamarine planning register entry
Source page date not stated. Official planning record, not an operator sales route. Check subsequent amendments and current conditions with the responsible authority. No application, booking or comment window is verified here.
Linked State of Victoria, Department of Transport and Planning source articles: Source rights retained; minimal original factual register account and ordinary links. Source: Ministerial permits register (© State of Victoria, Department of Transport and Planning), accessed 21 November 2026. Independently worded basic register metadata only. The inspected department terms exclude third-party material from its website licence; no blanket open licence for applicant descriptions, plans or attachments is inferred. No source prose, personal details, photographs, branding or applicant documents reproduced. No endorsement or recurring collection permission asserted.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| PA2403452: recorded permit decision, 28 March 2025 | Status not known | 28 March 2025 | |
| PA2403452-1: recorded correction decision, 14 August 2026 | Status not known | 14 August 2026 |
Printable community case file
Tullamarine data-centre development (PA2403452)
Record checked 21 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | 2 planning items recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Decision evidence. PA2403452: recorded permit decision, 28 March 2025: Status not known, 28 March 2025.
- Decision evidence. PA2403452-1: recorded correction decision, 14 August 2026: Status not known, 14 August 2026.
- Checked statement. Victoria's ministerial permits register records a data-centre land-use and development permit for land in Tullamarine, with a decision dated 28 March 2025 under PA2403452. source
- Checked statement. A correction linked to that original permit records Airtrunk Mel2 Pty Ltd as applicant and a decision dated 14 August 2026 under PA2403452-1. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 21 November 2026. Reported and planned figures are shown as such. Independently reviewed on 21 November 2026: Independent original-register and content-code review of minimal development identity, locality, permit dates, applicant distinction and source-use limits. Not verification of construction, operation or available compute.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 21). Tullamarine data-centre development (PA2403452): capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/tullamarine-pa2403452
BibTeX
@misc{computefinder_data_centres_tullamarine_pa2403452,
title = {Tullamarine data-centre development (PA2403452): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/data-centres/tullamarine-pa2403452}},
note = {Page last checked 21 November 2026. Retrieved 23 November 2026.}
}Page link: https://computefinder.net/data-centres/tullamarine-pa2403452. Page last checked 21 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.
Other sites in Australia
- Pawsey Centre, Kensington, Perth
- CDC Brooklyn data centre campus
- NEXTDC M3 data centre campus
- AirTrunk MEL1 Melbourne
- Gadi (NCI)
All detailed records in Australia / Same recorded stage in Australia
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact