Countries / Africa
Nigeria
Looking for hosting in Nigeria? Compare named facilities, their locations and enquiry routes before committing to a deployment.
For colocation, use the separately checked facility records below and ask operators about the exact site, racks, power, network and intended start date. A data centre listing is not a GPU-rental offer. Kasi still labels LOS Campus in Lekki and DNEK Campus in Eket as Coming Soon on the operator page checked 12 November 2026; that wording does not establish a completion date or prove that no service is available. Earlier trade reporting on market capacity, GPU shipments and launch targets is not current availability evidence. The legal and grid information below retains its earlier check date; verify the requirements for your workload before choosing a host.
Latest recorded change
Hosting guidance separates project claims from available compute. Kasi's own page still labels its two campuses Coming Soon. Older launch and GPU-shipment reporting is not treated as proof of a ready deployment. Read the official source.
Change checked 12 November 2026; next review by 12 December 2026. Only Kasi's displayed campus labels and this facility guidance were checked. Current Nxtra operation and capacity were not independently verified; its earlier report remains linked. Other legal, policy and grid evidence keeps its 2 October 2026 date.
AI policy and activity
No standalone AI law has been enacted. The Nigerian AI Bill 2025 (HB 2567) and National AI Commission Bill 2025 (SB 731) remain under deliberation. NITDA's February 2025 clearance guidelines require its approval for AI-enabled federal IT projects worth NGN 10 million or more.
Power and grid
The grid is reported to deliver 5,000 to 6,000 MW against 13,000 MW installed, so operators self-generate at roughly 0.28 to 0.33 dollars per kWh. Figures come from a single trade guide and should be treated as indicative.
Data centres and compute
| Site | Where | Status | Notes and source |
|---|---|---|---|
| Kasi Cloud LOS Campus Kasi Cloud | Lekki, Lagos | Planned | Operator page checked 12 November 2026: LOS Campus in Lekki is labelled Coming Soon. The older April 2026 launch expectation is not a confirmed opening, delivered capacity or availability check. Ask Kasi to confirm the campus location, current stage, service timing and whether it can meet your requirements. DNEK Campus in Eket is a separate planned campus, not another Lekki building. (source) Read the earlier trade guide. Historical source for the older launch and capacity reporting, not present availability or a newly verified technical specification. Link checked 2 October 2026; this does not refresh the other record fields. |
| Nxtra by Airtel Eko Atlantic Nxtra by Airtel | Lagos | Unknown | Earlier trade reporting described an AI-oriented facility and GPU shipments. Current operating stage, the power metric, completed fit-out, installed GPUs and rentable compute have not been independently verified here. Do not plan a deployment from a shipment report alone; confirm the named site, service specification and ready date with the operator. This is a qualification of the retained report, not a finding that the facility is closed or unavailable. (source) |
| LG3 Equinix (formerly MainOne) | Lagos | Unknown | A trade guide reported a Q1 2026 opening target for LG3, which has now passed. Ask Equinix directly whether LG3 is open and what space, power and delivery date it can quote for your deployment. (source) |
Rules and programmes
| Instrument | Kind | Status | What it does |
|---|---|---|---|
| National AI Strategy 2025-2029 Read the cited source | Policy | In force from 1 September 2025 | Digest page. Published September 2025; day of month not confirmed. |
| Senate Bill 722 (data localisation) Read the cited source | Law | Proposed | Introduced February 2025. Would require storage of Nigerian user data domestically and local offices for foreign data companies. Not enacted as of the digest. |
| Nigeria Data Protection Act 2023 Read the cited source | Law | In force from 1 June 2023 | In force June 2023 per the digest. Includes a right to contest solely automated decisions. |
Recorded facility evidence
These separately checked records retain their own source dates and explicit gaps; this does not refresh the other country fields or establish current operation or available compute.
- Rack Centre LGS 1 Lagos Record checked 10 November 2026. Inspect its evidence and limits.
- Rack Centre LGS 2 Lagos Record checked 10 November 2026. Inspect its evidence and limits.
- Open Access Data Centres Lagos (LOS1) Record checked 10 November 2026. Inspect its evidence and limits.
- Digital Realty Lagos LOS1 (Victoria Island) Record checked 10 November 2026. Inspect its evidence and limits.
- Digital Realty Lagos LKK2 (Ogbombo) Record checked 10 November 2026. Inspect its evidence and limits.
- Kasi Cloud LOS Campus Record checked 10 November 2026. Inspect its evidence and limits.
- Kasi Cloud DNEK Campus Record checked 10 November 2026. Inspect its evidence and limits.
- Africa Data Centres LOS1 Lagos Record checked 10 November 2026. Inspect its evidence and limits.
- Galaxy Backbone NSSC DC1 Abuja Record checked 12 November 2026. Inspect its evidence and limits.
- Galaxy Backbone Kano data centre Record checked 12 November 2026. Inspect its evidence and limits.
- 21CTL Ikeja data centre Record checked 12 November 2026. Inspect its evidence and limits.
- 21CTL Ikoyi data centre Record checked 12 November 2026. Inspect its evidence and limits.
Checked on 2 October 2026 and due for review by 1 January 2027. Many sources are trade press or law-firm summaries rather than official texts, and statuses such as reported or unconfirmed are shown as the source gives them. This is a summary, not legal advice. If something is wrong or out of date, tell us.
Cite this page
ComputeFinder. (2026, October 2). Nigeria: AI and compute. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/countries/nigeria
BibTeX
@misc{computefinder_countries_nigeria,
title = {Nigeria: AI and compute},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-ctry-0062}},
number = {cf-ctry-0062},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-ctry-0062. Permanent link: https://computefinder.net/entity/cf-ctry-0062. It keeps working if this page moves.
Page link: https://computefinder.net/countries/nigeria. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-ctry-0062"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>More in Africa
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact