ComputeFinder

Data centres / South Africa

Africa Data Centres JHB1 Midrand

Midrand, Johannesburg, South Africa.

Stage not knownSouth Africa

What we checked

One listing covers the named Midrand campus and its expansion halls. The operator page contains older expansion plans; ask which halls can meet your requirements now. A street address, exact building point and current available capacity have not been established here.

Operate this site or have better evidence? .

Operator
Africa Data Centres
Owner
Not stated
Stage
Stage not known
Cooling
The operator describes hot- and cold-aisle containment. This does not establish liquid-cooling support, rack power density or measured efficiency; confirm the intended hall and equipment requirements.
Connectivity
The operator describes links to major hubs and dark-fibre infrastructure. Named carriers, routes, bandwidth and current connection availability are not verified here; ask which options can serve your racks.

Ask Africa Data Centres about JHB1 Midrand colocation
Source page date not stated. Use the facility enquiry form and specify the site code, racks or hall, power requirement and move-in date. Confirm which services and space are available for your deployment.

Linked Africa Data Centres source articles: Copyright retained; no open content licence asserted. Minimal independently worded, attributed identity, location and service facts with ordinary operator links. No marketing text, specification tables, images, logos or prices reproduced. No endorsement or current availability claim.

Printable community case file

Africa Data Centres JHB1 Midrand

Record checked 10 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. Africa Data Centres identifies JHB1 as its Midrand location in Johannesburg and provides a facility-tour enquiry form. source
  • Checked statement. The Midrand page describes connectivity to major hubs and dark-fibre infrastructure, plus hot- and cold-aisle containment. These are operator descriptions, not verified service availability or performance. source
  • Checked statement. A 13 April 2026 operator announcement identifies Midrand and Samrand as its Gauteng campuses. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

3 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 10 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 10). Africa Data Centres JHB1 Midrand: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/africa-data-centres-jhb1-midrand

BibTeX
@misc{computefinder_data_centres_africa_data_centres_jhb1_midrand,
  title        = {Africa Data Centres JHB1 Midrand: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0127}},
  number       = {cf-dc-0127},
  note         = {Page last checked 10 November 2026. Retrieved 14 November 2026.}
}

Stable ID: cf-dc-0127. Permanent link: https://computefinder.net/entity/cf-dc-0127. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/africa-data-centres-jhb1-midrand. Page last checked 10 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0127"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in South Africa

All detailed records in South Africa / Same recorded stage in South Africa

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact