Stage not knownNigeria
What we checked
- Galaxy Backbone identifies National Shared Services Centre Data Center 1 (NSSC DC1), Phase 1, in Abuja. (source)
- The operator advertises colocation and cloud services and links a quote-request form. Confirm the service and hosting location for your workload. (source)
The operator identifies NSSC DC1 in Abuja. Its Phase 1 reference is context for this named facility, not an additional site. A company office address is not a verified data-hall address. The source’s publication year is not established. Current stage, capacity, certification, street address, coordinates and available compute remain unverified.
Operate this site or have better evidence? .
- Operator
- Galaxy Backbone Limited
- Owner
- Not stated
- Stage
- Stage not known
Ask Galaxy Backbone about Abuja NSSC DC1
Source page date not stated. Use the operator’s quote-request form and specify Abuja NSSC DC1. For colocation, describe your own equipment, rack space, power, network and intended start date. For hosted compute, separately confirm the service specification and hosting location. Ask about current eligibility, availability and price; an enquiry is not a reservation.
Linked Galaxy Backbone Limited source articles: Copyright retained; no open content licence asserted. Minimal independently worded identity and location facts with attribution and ordinary links only. No source narrative, tables, images, logos or technical specifications reproduced; no endorsement or current availability claim.
Printable community case file
Galaxy Backbone NSSC DC1 Abuja
Record checked 12 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. Galaxy Backbone identifies National Shared Services Centre Data Center 1 (NSSC DC1), Phase 1, in Abuja. source
- Checked statement. The operator advertises colocation and cloud services and links a quote-request form. Confirm the service and hosting location for your workload. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 12 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 12). Galaxy Backbone NSSC DC1 Abuja: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/galaxy-backbone-nssc-dc1-abuja
BibTeX
@misc{computefinder_data_centres_galaxy_backbone_nssc_dc1_abuja,
title = {Galaxy Backbone NSSC DC1 Abuja: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0135}},
number = {cf-dc-0135},
note = {Page last checked 12 November 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0135. Permanent link: https://computefinder.net/entity/cf-dc-0135. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/galaxy-backbone-nssc-dc1-abuja. Page last checked 12 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0135"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Nigeria
- Rack Centre LGS 1 Lagos
- Rack Centre LGS 2 Lagos
- Open Access Data Centres Lagos (LOS1)
- Digital Realty Lagos LOS1 (Victoria Island)
- Digital Realty Lagos LKK2 (Ogbombo)
All detailed records in Nigeria / Same recorded stage in Nigeria
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact