Stage not knownNigeria
What we checked
- 21st Century Technologies lists Ikoyi Data Center on its digital-infrastructure page. (source)
- The same page provides general company contact details. Specify the named facility and confirm the hosting location and service directly. (source)
The company website lists Ikoyi Data Center as a named facility entry. The operator is shown under the website's 21st Century Technologies brand; legal ownership is not established. Ikoyi is a locality label, not a verified street address or entrance. The general Lekki office address is not assigned to this facility. Current stage, capacity, certification, coordinates and available compute remain unverified. This is not a GPU-rental offer.
Operate this site or have better evidence? .
- Operator
- 21st Century Technologies
- Owner
- Not stated
- Stage
- Stage not known
Ask 21CTL about its Ikoyi data centre
Source page date not stated. Use the general company contact details printed on the data-centre page and specify Ikoyi. Confirm the current operator, facility address, service type, rack and power requirements, network, intended start date and quotation. The contact route is not a booking or availability confirmation; do not treat the office address as a facility entrance.
Linked 21st Century Technologies source articles: Copyright retained; no open content licence asserted. Minimal independently worded attributed facility identity, district and general enquiry-route facts with an ordinary source link. No source narrative, specification table, images, logos, personal contacts or price data reproduced. No endorsement, legal-ownership or current availability claim.
Printable community case file
21CTL Ikoyi data centre
Record checked 12 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. 21st Century Technologies lists Ikoyi Data Center on its digital-infrastructure page. source
- Checked statement. The same page provides general company contact details. Specify the named facility and confirm the hosting location and service directly. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 12 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 12). 21CTL Ikoyi data centre: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/21ctl-ikoyi-data-centre
BibTeX
@misc{computefinder_data_centres_21ctl_ikoyi_data_centre,
title = {21CTL Ikoyi data centre: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0141}},
number = {cf-dc-0141},
note = {Page last checked 12 November 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0141. Permanent link: https://computefinder.net/entity/cf-dc-0141. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/21ctl-ikoyi-data-centre. Page last checked 12 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0141"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Nigeria
- Rack Centre LGS 1 Lagos
- Rack Centre LGS 2 Lagos
- Open Access Data Centres Lagos (LOS1)
- Digital Realty Lagos LOS1 (Victoria Island)
- Digital Realty Lagos LKK2 (Ogbombo)
All detailed records in Nigeria / Same recorded stage in Nigeria
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact