Data centres / UK and Ireland / United Kingdom
Virtus Slough campus
Slough, Berkshire, United Kingdom.
OperatingUnited Kingdom
What we checked
- Virtus describes the Slough campus as seven facilities and states 145.5MW of IT load. (source)
- Buildings are listed with individual MW figures, from 6.6MW (LONDON10) to 33.5MW (LONDON19), and the operator says its sites are built to an Uptime Tier III standard. (source)
The 145.5MW IT load is the operator's campus figure on an undated page. The seven building figures listed on the same page add up to 132.2MW, so the headline may include capacity that is not yet built; treat it with care.
Operate this site or have better evidence? .
- Operator
- Virtus Data Centres
- Owner
- Not stated
- Stage
- Operating (source, 2 October 2026)
- Connectivity
- Carrier neutral with access to major cloud and connectivity platforms, according to the operator.
- Grid connection
- VIRTUS's undated LONDON9 sheet lists an incoming National Grid supply of 50 MVA with diverse routing. (50 MVA)
Scope: LONDON9 building at the Slough campus only; apparent-power supply specification, with no verified energisation date, voltage or available compute.. Stage: Stage not known. Basis: reported. Evidence: source claim. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-10-31T22:53:56Z; evidence checked: 31 October 2026.
VIRTUS Data Centres: Copyright retained; no open licence verified.. Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import. Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- VIRTUS's undated LONDON9 sheet lists an incoming National Grid supply of 50 MVA with diverse routing. (50 MVA)
- PUE
- VIRTUS's undated LONDON9 sheet states a design PUE below 1.3.
Scope: LONDON9 building only. The inequality is retained as text; no exact-value, campus-wide or measured PUE is asserted.. Stage: Stage not known. Basis: reported. Evidence: source claim. PUE kind: design. Evidence date: not stated. source. Source version: not established. Source published: not stated; source updated: not stated; retrieved: not recorded; reviewed: 2026-10-31T22:53:56Z; evidence checked: 31 October 2026.
VIRTUS Data Centres: Copyright retained; no open licence verified.. Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import. Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant.
Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.
- VIRTUS's undated LONDON9 sheet states a design PUE below 1.3.
Inspect the limits of this source check
These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.
- Water use, Chips, Coordinates: Not inspected in this scope. This admission checks only LONDON9 incoming-supply and design-PUE statements. It does not audit campus-wide water records, installed-equipment schedules or numeric site coordinates for these unfilled fields. Scope recorded 31 October 2026; inspected source context. VIRTUS Data Centres: Copyright retained; no open licence verified.. Only this minimal operator-attributed basic technical fact and an ordinary unframed exact source link. No narrative, quotations, technical-table reproduction, graphics, marketing expression, contacts or dataset adaptation/import. Terms route exposes no substantive terms; missing terms are not permission or proof no restriction exists. No contrary express condition observed for this exact use. Reassess newly evidenced applicable restriction; no blanket or recurring grant.
Capacity
| Measure | Stage | Basis | MW | As of | Source |
|---|---|---|---|---|---|
| IT load | Operating | reported | 145.5 | 2 October 2026 | source |
These figures measure different things and are not added together.
Virtus Slough source route
Environment Agency Virtus Slough publication. Open the original for its dates, scope and conditions. This link does not verify current operation or availability.
Source link checked 17 October 2026; next review by 23 October 2026. Source publication: 20 April 2026. Source update date is not stated. Source discovery only. The publication date identifies the linked page, not an admitted permit-content fact or a licence grant. No permit-condition, operator, physical-phase, current permission, compliance, stage, capacity, grid connection or availability claim is added. Earlier campus records, mismatch cautions and dates remain unchanged.
Environment Agency / GOV.UK: Crown copyright retained; ordinary link only. Ordinary unframed source link and neutral citation metadata only. Actual GOV.UK terms expressly welcome linking without charged click-through, endorsement or affiliation claims. No permit-content adaptation, quotations, PDFs, maps, applicant evidence, tables, private signatories, contacts or datasets reproduced. Full applicable Open Government Licence conditions could not be independently inspected after a technical retrieval error; content adaptation remains held, with no retry or alternate-access attempt in this batch. No open-content clearance, blanket source or recurring-monitoring grant is asserted. A successful supported licence inspection and independent exact-use review are required before factual adaptation.
Printable community case file
Virtus Slough campus
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 2 October 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Virtus Slough source route
Environment Agency Virtus Slough publication. Open the original for its dates, scope and conditions. This link does not verify current operation or availability.
Source link checked 17 October 2026; next review by 23 October 2026. Source publication: 20 April 2026. Source update date is not stated. Source discovery only. The publication date identifies the linked page, not an admitted permit-content fact or a licence grant. No permit-condition, operator, physical-phase, current permission, compliance, stage, capacity, grid connection or availability claim is added. Earlier campus records, mismatch cautions and dates remain unchanged.
Environment Agency / GOV.UK: Crown copyright retained; ordinary link only. Ordinary unframed source link and neutral citation metadata only. Actual GOV.UK terms expressly welcome linking without charged click-through, endorsement or affiliation claims. No permit-content adaptation, quotations, PDFs, maps, applicant evidence, tables, private signatories, contacts or datasets reproduced. Full applicable Open Government Licence conditions could not be independently inspected after a technical retrieval error; content adaptation remains held, with no retry or alternate-access attempt in this batch. No open-content clearance, blanket source or recurring-monitoring grant is asserted. A successful supported licence inspection and independent exact-use review are required before factual adaptation.
Evidence carried into this printout
- Recorded stage. Operating, dated 2 October 2026: stage source
- Checked statement. Virtus describes the Slough campus as seven facilities and states 145.5MW of IT load. source
- Checked statement. Buildings are listed with individual MW figures, from 6.6MW (LONDON10) to 33.5MW (LONDON19), and the operator says its sites are built to an Uptime Tier III standard. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Power source
- Cooling
- Water use
- Chips
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Virtus Slough campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/virtus-slough-campus
BibTeX
@misc{computefinder_data_centres_virtus_slough_campus,
title = {Virtus Slough campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0008}},
number = {cf-dc-0008},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0008. Permanent link: https://computefinder.net/entity/cf-dc-0008. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/virtus-slough-campus. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0008"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact