Data centres / UK and Ireland / United Kingdom
Telehouse London Docklands campus
Docklands, London, United Kingdom.
OperatingUnited Kingdom
What we checked
- Telehouse operates five London data centres, four on the Docklands campus and Telehouse South, opened in 2022 at Blackwall Yard. (source)
- The campus has a private 132kV substation of 50MVA with two lines connected directly to the national grid. (source)
Five London buildings are listed: North, East, West, North Two and South. The operator states 18MW total power capacity for Telehouse South, but the metric is not defined, so it is not entered as a capacity claim. The substation figure is in MVA, not MW.
Operate this site or have better evidence? .
- Operator
- Telehouse
- Owner
- Not stated
- Stage
- Operating (source, 2 October 2026)
- Power
- Telehouse says it runs an on-site dual primary substation at 132kV with 50MVA total capacity at the Docklands campus.
- Cooling
- The operator lists N+1 cooling redundancy for Telehouse South and an ASHRAE room design for the Docklands buildings.
- Connectivity
- Telehouse says customers can reach over 1,000 carriers and ISPs, and that the campus hosts most of LINX capacity.
- Certifications
- PCI-DSS, ISO 9001, ISO 14001, ISO 22301, ISO/IEC 27001, ISO 45001, ISO 50001
Printable community case file
Telehouse London Docklands campus
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 2 October 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 2 October 2026: stage source
- Checked statement. Telehouse operates five London data centres, four on the Docklands campus and Telehouse South, opened in 2022 at Blackwall Yard. source
- Checked statement. The campus has a private 132kV substation of 50MVA with two lines connected directly to the national grid. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Telehouse London Docklands campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/telehouse-london-docklands
BibTeX
@misc{computefinder_data_centres_telehouse_london_docklands,
title = {Telehouse London Docklands campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0017}},
number = {cf-dc-0017},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0017. Permanent link: https://computefinder.net/entity/cf-dc-0017. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/telehouse-london-docklands. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0017"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact