Data centres / UK and Ireland / United Kingdom

North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd)

Anglesey and Gwynedd, North Wales, United Kingdom.

AnnouncedUnited Kingdom

What we checked

Zone designation only. An investment partner was still being sought at announcement, and no operator, MW figure or planning application was found in fetched sources.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Announced (source, 13 November 2025)
Power
The government links the zone to the planned Wylfa small modular reactors, with power to the grid expected from the mid-2030s.
Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Chips, Coordinates: Not stated in the inspected source. Only the selected 13 November 2025 government announcement paragraphs and notes were inspected. They identify a two-location North Wales proposal and general future grid/planning measures; they state no site-specific voltage/named substation, design/target/measured PUE, bounded water withdrawal/consumption/WUE, hardware model or explicit official point/CRS. Prospective high-voltage/substation policy, priority access and Wylfa reactor ambitions are not an issued connection, delivered capacity, commissioning or operation at either place. This is not an exhaustive planning/EIA audit. Scope recorded 1 November 2026; inspected source context. UK Department for Science, Innovation and Technology / Wales Office / Prime Minister Office: The exact page carries a conditional OGL v3.0 footer. This proposal uses only original minimal inspection-scope wording and ordinary links; no component-wide adaptation grant is assumed.. Only an independently worded account of the selected official announcement paragraphs and ordinary uncharged, unframed source links. No stakeholder quotation, image, logo, ministerial quotation, source prose, contact, programme quantity, financial/job estimate or third-party material is imported. A separate independent review has completed for this exact limited account only; no source-content adaptation or recurring acquisition permission follows. UK government departments; 13 November 2025 North Wales announcement; exact original linked. No endorsement. Selected-source limits condensed in original words; no source narrative, quotation, table or asset reproduced. Actual source footer and actual GOV.UK terms were inspected. Ordinary linking is encouraged within the stated conditions; no charge or endorsement is implied. General Crown/OGL wording has exceptions and is not extended to third-party content or graphics. The retained National Archives source/notice stop was respected; no such route was requested. Independent source/use review completed at 2026-11-01T04:27:58.130Z. This model mapping does not renew source, publication, event, retrieval or parent clocks.

Printable community case file

North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd)

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 13 November 2025Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Announced, dated 13 November 2025: stage source
  • Checked statement. The zone straddles the Menai Strait with one base at Prosperity Parc on Anglesey and another at Trawsfynydd in Gwynedd. source
  • Checked statement. It is led by a consortium including Stena Line and regional bodies such as Isle of Anglesey County Council and Bangor University. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

2 of 13 facility fields recorded

2 separately recorded source statements. These are not included in the facility-field count.

2 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/north-wales-ai-growth-zone

BibTeX
@misc{computefinder_data_centres_north_wales_ai_growth_zone,
  title        = {North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd): capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0021}},
  number       = {cf-dc-0021},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0021. Permanent link: https://computefinder.net/entity/cf-dc-0021. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/north-wales-ai-growth-zone. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0021"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in United Kingdom

All detailed records in United Kingdom / Same recorded stage in United Kingdom

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact