- Google's 14 December 2020 post says the Fredericia data centre opened the previous week. (source)
- Google's location page says the Fredericia data centre has been operating since 2020. (source)
Google's post of 14 December 2020 says the Fredericia data centre opened the previous week. The stage date records that it was operating by the publication date, not an exact opening day. No MW figure is stated.
Operate this site or have better evidence? .
- Operator
- Owner
- Stage
- Operating (source, 14 December 2020)
- Power
- Google says the site has used renewable energy since going online in 2020 and cites a Danish solar project as extra carbon-free supply.
Printable community case file
Google Fredericia data centre
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 14 December 2020 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 14 December 2020: stage source
- Checked statement. Google's 14 December 2020 post says the Fredericia data centre opened the previous week. source
- Checked statement. Google's location page says the Fredericia data centre has been operating since 2020. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Google Fredericia data centre: capacity, planning and power. ComputeFinder. Retrieved November 17, 2026, from https://computefinder.net/data-centres/google-fredericia
BibTeX
@misc{computefinder_data_centres_google_fredericia,
title = {Google Fredericia data centre: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0035}},
number = {cf-dc-0035},
note = {Page last checked 2 October 2026. Retrieved 17 November 2026.}
}Stable ID: cf-dc-0035. Permanent link: https://computefinder.net/entity/cf-dc-0035. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/google-fredericia. Page last checked 2 October 2026. Retrieved 17 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0035"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Denmark
- Meta Odense data centre campus
- Gefion AI supercomputer (DCAI), Copenhagen
- Prime Data Centers Esbjerg campus
All detailed records in Denmark / Same recorded stage in Denmark
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact