Stage not knownUnited Kingdom
Location
Hayes, UB4 0SL, United Kingdom
Exact building coordinates are not recorded here.
Location is limited to the place and postcode in the regulator notice. An exact building point or street number has not been established.
Location source. Source dated 11 August 2025. Location evidence checked 10 November 2026.
Read the original Environment Agency notice
Source page date not stated. Use the named operator and installation to investigate this site. This notice is not a commercial booking route or a current operation check.
What we checked
- The Environment Agency notice identifies the installation as COLT- Hayes and names Colt Data Centre Services UK Limited as the operator. (source)
Identified through an environmental-permit publication. A permit for a named installation does not establish its current physical operating stage, completed fit-out or compute available to buy.
Operate this site or have better evidence? .
- Operator
- Colt Data Centre Services UK Limited
- Owner
- Not stated
- Stage
- Stage not known
Linked Environment Agency / GOV.UK source articles: Open Government Licence v3.0, except third-party material. Contains public sector information licensed under the Open Government Licence v3.0. Identity and location summaries use the regulator-authored GOV.UK notice only; no conditional-licence public-register data, applicant material, images or numerical specifications are imported. No endorsement or current permit-compliance, operating-stage or availability conclusion.
Printable community case file
COLT Hayes data centre
Record checked 10 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. The Environment Agency notice identifies the installation as COLT- Hayes and names Colt Data Centre Services UK Limited as the operator. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 10 November 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 10). COLT Hayes data centre: capacity, planning and power. ComputeFinder. Retrieved November 14, 2026, from https://computefinder.net/data-centres/colt-hayes-ub4-london
BibTeX
@misc{computefinder_data_centres_colt_hayes_ub4_london,
title = {COLT Hayes data centre: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0115}},
number = {cf-dc-0115},
note = {Page last checked 10 November 2026. Retrieved 14 November 2026.}
}Stable ID: cf-dc-0115. Permanent link: https://computefinder.net/entity/cf-dc-0115. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/colt-hayes-ub4-london. Page last checked 10 November 2026. Retrieved 14 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0115"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact