Supply chain / Nuclear
TerraPower Natrium (Kemmerer, Wyoming)
A 345 MWe sodium-cooled fast reactor with molten salt storage, under construction in Kemmerer, Wyoming.
- Type
- Programme
- Where it sits
- It is a regulator-cleared advanced reactor with storage that could in time supply large loads, though it is not itself a data centre project.
- Constraint
- A separate NRC operating licence is still required before the plant can run, and completion is targeted for 2030 (US DOE).
What we checked
- The NRC issued a construction permit on 9 March 2026, described by DOE as the first for a commercial non-light-water power reactor. (source)
- The plant is 345 MWe and can boost output to 500 MW using molten salt storage. (source)
Written by ComputeFinder from public pages on 2 October 2026. Company statements are the company's own, not independently checked, and reported items are marked as such. Not yet reviewed line by line by a second person. If something is wrong, .
Are you this organisation? .
Cite this page
ComputeFinder. (2026, October 2). TerraPower Natrium (Kemmerer, Wyoming): role in the compute supply chain. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/supply-chain/terrapower-natrium
BibTeX
@misc{computefinder_supply_chain_terrapower_natrium,
title = {TerraPower Natrium (Kemmerer, Wyoming): role in the compute supply chain},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-sup-0077}},
number = {cf-sup-0077},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-sup-0077. Permanent link: https://computefinder.net/entity/cf-sup-0077. It keeps working if this page moves.
Page link: https://computefinder.net/supply-chain/terrapower-natrium. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-sup-0077"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Others in this group
- NuScale Power
- X-energy and Amazon Cascade facility
- Constellation Crane Clean Energy Center restart
- Kairos Power, Google and TVA collaboration
- Oklo Aurora powerhouse at Idaho National Laboratory
More in this supply layer
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact