Supply chain / Nuclear
NuScale Power
Developer of a light water small modular reactor whose uprated US460 design completed NRC standard design approval review.
- Type
- Company
- Where it sits
- It offers a licensed SMR design, with commercialisation through ENTRA1 and a collaboration with TVA, but no plant is reported operating for data centres.
- Constraint
- A design approval is not a plant licence, so each site still needs its own licensing and construction before any power is delivered (NRC page).
What we checked
- The NRC completed review of the US460 standard design approval in May 2025, about two months ahead of schedule. (source)
- The design is six modules of 77 MWe each, 462 MWe in total. (source)
- NuScale says ENTRA1 Energy is its exclusive commercialisation partner and that it is working with TVA on a 6 GW SMR programme. (source)
Written by ComputeFinder from public pages on 2 October 2026. Company statements are the company's own, not independently checked, and reported items are marked as such. Not yet reviewed line by line by a second person. If something is wrong, .
Are you this organisation? .
Cite this page
ComputeFinder. (2026, October 2). NuScale Power: role in the compute supply chain. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/supply-chain/nuscale-power
BibTeX
@misc{computefinder_supply_chain_nuscale_power,
title = {NuScale Power: role in the compute supply chain},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-sup-0078}},
number = {cf-sup-0078},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-sup-0078. Permanent link: https://computefinder.net/entity/cf-sup-0078. It keeps working if this page moves.
Page link: https://computefinder.net/supply-chain/nuscale-power. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-sup-0078"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Others in this group
- X-energy and Amazon Cascade facility
- Constellation Crane Clean Energy Center restart
- Kairos Power, Google and TVA collaboration
- Oklo Aurora powerhouse at Idaho National Laboratory
- TerraPower Natrium (Kemmerer, Wyoming)
More in this supply layer
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact