Showing 7 source records.

Matching source records
RecordCountryOrganisation and roleSource-reported addressRecorded stageDated building evidenceEvidence typeRecord date
Digital Realty Frankfurt campus (metro cluster)GermanyFacility operator: Digital Realty; facility owner: Digital RealtyNot recorded hereOperatingNo dated building evidence recorded hereDetailed evidence record2026-10-02
Google Dietzenbach data centreGermanyFacility operator: Google; facility owner: GoogleNot recorded hereAnnouncedNo dated building evidence recorded hereDetailed evidence record2026-10-02
Google Hanau data centreGermanyFacility operator: Google; facility owner: GoogleNot recorded hereOperatingNo dated building evidence recorded hereDetailed evidence record2026-10-02
HLRS Stuttgart (Hunter and HammerHAI)GermanyFacility operator: High-Performance Computing Center Stuttgart (HLRS); facility owner: University of StuttgartNot recorded hereOperatingNo dated building evidence recorded hereDetailed evidence record2026-10-02
JUPITER exascale system, Forschungszentrum JülichGermanyFacility operator: Forschungszentrum Jülich (Jülich Supercomputing Centre); facility owner: Not recordedNot recorded hereOperatingNo dated building evidence recorded hereDetailed evidence record2026-10-02
Schwarz Digits Lübbenau data centreGermanyFacility operator: Schwarz Digits (STACKIT); facility owner: Schwarz GroupNot recorded hereUnder constructionNo dated building evidence recorded hereDetailed evidence record2026-10-02
Telekom Industrial AI Cloud, Munich (Tucherpark)GermanyFacility operator: Deutsche Telekom (T-Systems); facility owner: Deutsche TelekomNot recorded hereOperatingNo dated building evidence recorded hereDetailed evidence record2026-10-02

Map and country groups · Detailed evidence records · AI estimates dataset · Evidence coverage

About these records and their limits

These are 234 source records, not a complete or deduplicated world census. A campus may contain several buildings, and sources may describe different phases or the same place. A missing result does not mean no data centre exists there.

Epoch's owner field attributes AI hardware, not necessarily the facility owner or operator. Detailed records keep facility operators and owners distinct. Imported Epoch records have no whole-record lifecycle stage or sourced map coordinates in our current extraction. Separately dated building reports describe some buildings, not an entire completed campus. The building-evidence filter is independent of Recorded stage. Future projections are excluded. 80 existing records carry separately dated, source-reported address/location fields; these do not establish a building/phase identity, map coordinates or operating status. Some values are localities or plus codes rather than street addresses. Display normalises whitespace and dash typography; exported fields retain the source values. Other addresses are not recorded here, not proven absent. Stage not recorded must not be read as unbuilt. Operating does not establish compute available to buy.

Data centre, campus or AI project?

A data centre houses computing infrastructure. A campus can group buildings and shared infrastructure. AI describes the computing use, rather than a separate lifecycle stage. We retain each source's scope and do not infer a building count, operational status or available capacity from a project name.