ComputeFinder

Countries / Europe

Greece

Greece inaugurated the DAEDALUS supercomputer at Lavrio while configuration continues before planned user access.

GRNET reports that DAEDALUS was inaugurated at the Lavrion Technological and Cultural Park on 19 October 2026. That account identifies the system as the compute core of the Pharos AI Factory and plans gradual first-user access during December after full configuration, with calls, terms and deadlines to follow. It is not a current application notice. See the separately dated access check below. The existing national strategy and earlier EuroHPC system details retain their own sources and dates. We did not collect Greek power facts.

The Region of Central Greece posted an environmental-impact-study notice on 9 November 2026 for two proposed data centres in Amfikleia-Elateia, Phthiotis, under reference PET 2610002327. This does not establish approval, a grid connection, construction or available compute. Follow the official notice for primary documents and participation information; its embedded PDF remains unread in this review, so deadlines and detailed conditions are not verified here. This proposal is separate from DAEDALUS.

Read the full account and its limits · Read the original source.

Source dated 9 November 2026; this development checked 11 November 2026. This does not refresh the older country evidence below.

Latest recorded change

Can I apply for DAEDALUS time? A current allocation route is not verified here. Do not treat inauguration as an invitation to apply. The pages checked on 11 November did not verify an open DAEDALUS allocation call; that is not proof that no call exists. GRNET's 20th production call names ARIS, not DAEDALUS, and gives a 26 June 2026 deadline. Ask GRNET which current call explicitly covers DAEDALUS, your eligibility, the resources offered and the allocation start date before preparing an application. Read the official source.

Change checked 11 November 2026; next review by 18 November 2026. This is a bounded access-route review, not a new service-start announcement or a complete search of every call. The older inauguration, December access plan, policy and other country facts retain their own dates.

AI policy and activity

Pharos is a flagship of the Blueprint for Greece's AI Transformation and DAEDALUS is its compute core. GRNET's 19 October account supports inauguration, not demonstrated production access; it said access conditions and deadlines would be announced later.

Data centres and compute

Data centres and compute
SiteWhereStatusNotes and source
DAEDALUS
GRNET
Lavrio, AtticaInaugurated; configuring before planned user accessGRNET's 19 October 2026 inauguration account planned gradual first-user access during December after full configuration, with calls and terms to follow. This historical plan is not a current application route or evidence of general availability. (source)

Rules and programmes

Rules and programmes
InstrumentKindStatusWhat it does
Greece national AI strategy
Read the cited source
PolicyIn forceUS Commerce Department market note. Covers sector adoption, start-up support, EU AI Act alignment and participation in EuroHPC.
EuroHPC AI Factory: Pharos
Read the cited source
ProgrammeIn forceEuroHPC page for Pharos, listing AI-ready datasets, pre-trained models and access to DAEDALUS.

Official research-access information

Ask GRNET about the current DAEDALUS access route · Institutional source. GRNET lists a general access-enquiry contact, not a DAEDALUS application form. EuroHPC identifies the Greek Pharos/DAEDALUS context but does not give a service-start date on this page. Follow the enquiry route to confirm a named call, eligibility and current resources. Ordinary attributed links and minimal original facts only; no source prose, specification table, image or price copied, no endorsement or available allocation inferred. Link checked 11 November 2026; next link review by 18 November 2026. This does not refresh the other country fields.

Recorded facility evidence

These separately checked records retain their own source dates and explicit gaps; this does not refresh the other country fields or establish current operation or available compute.

Checked on 2 October 2026 and due for review by 1 January 2027. Many sources are trade press or law-firm summaries rather than official texts, and statuses such as reported or unconfirmed are shown as the source gives them. This is a summary, not legal advice. If something is wrong or out of date, tell us.

Cite this page

ComputeFinder. (2026, October 2). Greece: AI and compute. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/countries/greece

BibTeX
@misc{computefinder_countries_greece,
  title        = {Greece: AI and compute},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-ctry-0014}},
  number       = {cf-ctry-0014},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-ctry-0014. Permanent link: https://computefinder.net/entity/cf-ctry-0014. It keeps working if this page moves.

Page link: https://computefinder.net/countries/greece. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-ctry-0014"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

More in Europe

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact