Countries / Europe
Iceland
Iceland offers near-fully renewable power for AI data centres and is expanding substations and long-term supply contracts.
Iceland's electricity is about 70% hydro and 30% geothermal. Data centres took an estimated 5 to 6% of national power demand in 2022 and 2023, and the sector has shifted from bitcoin mining to AI hosting. Landsvirkjun has signed an extra 12 MW of firm supply for Borealis at Blonduos, equipped for liquid-cooled NVIDIA systems, and Verne and Landsnet switched on the largest privately owned substation on the Reykjanes peninsula in May 2025. A new Industrial Policy names data centre growth as an opportunity. For someone seeking compute, Iceland is a colocation and cloud host rather than a public compute provider.
AI policy and activity
EuroHPC lists Iceland as an AI Factory Antenna in the Finnish LUMI group. We did not collect a national AI strategy or AI Act status.
Power and grid
A July 2026 report in The Parliament Magazine puts generation at about 70% hydro and 30% geothermal and says Iceland uses only about 20% of the energy it produces for homes and local industry, with the rest sold to industry including aluminium smelters and increasingly data centres.
Data centres and compute
| Site | Where | Status | Notes and source |
|---|---|---|---|
| Borealis Blonduos campus Borealis Data Center | Blonduos | Operating | Being equipped for the latest liquid-cooled NVIDIA infrastructure. Borealis also has sites in Reykjavik and Reykjanesbaer. (source) |
| Verne Keflavik campus Verne | Keflavik | Operating | A new high-capacity substation with Landsnet was switched on on 19 May 2025 to support HPC and AI growth. (source) |
Rules and programmes
| Instrument | Kind | Status | What it does |
|---|---|---|---|
| Iceland Industrial Policy Read the cited source | Policy | In force | We read only a utility news release that says the recently published policy identifies data centre growth as an opportunity. We did not read the policy itself. |
| Landsvirkjun power purchase agreement with Borealis Read the cited source | Grid | In force | Adds 12 MW of firm power at Blonduos to existing contracts. |
Recorded facility evidence
These separately checked records retain their own source dates and explicit gaps; this does not refresh the other country fields or establish current operation or available compute.
- atNorth ICE01 Record checked 2 October 2026. Inspect its evidence and limits.
- atNorth ICE02 campus Record checked 2 October 2026. Inspect its evidence and limits.
- Verne Keflavik campus Record checked 2 October 2026. Inspect its evidence and limits.
Checked on 2 October 2026 and due for review by 1 January 2027. Many sources are trade press or law-firm summaries rather than official texts, and statuses such as reported or unconfirmed are shown as the source gives them. This is a summary, not legal advice. If something is wrong or out of date, tell us.
Cite this page
ComputeFinder. (2026, October 2). Iceland: AI and compute. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/countries/iceland
BibTeX
@misc{computefinder_countries_iceland,
title = {Iceland: AI and compute},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-ctry-0015}},
number = {cf-ctry-0015},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-ctry-0015. Permanent link: https://computefinder.net/entity/cf-ctry-0015. It keeps working if this page moves.
Page link: https://computefinder.net/countries/iceland. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-ctry-0015"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>More in Europe
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact