Luxembourg

Luxembourg runs the MeluXina supercomputer, is adding the AI-optimised MeluXina-AI and is reserving grid capacity far above current data centre use.

LuxProvide operates MeluXina at Bissen, which EuroHPC lists at 12.81 petaflops sustained. EuroHPC selected Luxembourg to host MeluXina-AI and a national AI Factory in December 2024, at an estimated cost of 112 million euros shared with EuroHPC. Half of its capacity is reserved for the EuroHPC network and half for national needs. LuxProvide's chief executive says it will be ten times more powerful than today. Paperjam reports that Creos is setting aside capacity for data centres at about 20 times what they use today. For someone seeking compute, MeluXina is a secure, certified option for sensitive data, with the new system not yet confirmed as live.

AI policy and activity

The AI Factory is coordinated by Luxinnovation with sector hubs in finance, space, cybersecurity and the green economy. EuroHPC lists services as available from a date not yet announced.

Power and grid

Paperjam reports the national energy and climate plan expects consumption to rise 25% from 6,209 GWh in 2023 to 7,756 GWh in 2030 without counting data centres. Grid operator Creos has identified seven data centre projects for its 2040 scenario and is setting aside or allocating capacity about 20 times current data centre use.

Data centres and compute

SiteWhereStatusNotes and source
MeluXina
LuxProvide
BissenOperatingEuroHPC lists 12.81 petaflops sustained with NVIDIA A100 GPUs. LuxProvide's chief executive describes a Tier IV, ISO 27001-certified facility. (source)
MeluXina-AI
LuxProvide
Bissen and Bettembourg (LuxConnect data centres)PlannedIntegrated into LuxConnect's data centres, with 50% of capacity reserved for the EuroHPC network and European countries. (source)

Rules and programmes

InstrumentKindStatusWhat it does
EuroHPC AI Factory: Luxembourg AI Factory and MeluXina-AIProgrammeIn forceEuroHPC page. The cost split is from a Luxembourg news report of December 2024: 80 million euros for the machine and 32 million for five years of hosting and operation, each 50% EuroHPC funded.

Checked on 2 October 2026 and due for review by 1 January 2027. Many sources are trade press or law-firm summaries rather than official texts, and statuses such as reported or unconfirmed are shown as the source gives them. This is a summary, not legal advice. If something is wrong or out of date, tell us.