ComputeFinder

Data centres / North America / United States

Project Phoenix, Mount Carmel Township data-centre proposal

Mount Carmel Township, Northumberland County, Pennsylvania, United States.

Stage not knownUnited States

What we checked

Proposed development account, not an operating facility or available compute offer. The Project Phoenix name appears on the linked conditional-use drawing dated 29 October 2026, marked not for construction. It is not a separate building identity. The applicant disclosure names AMD as tenant under an executed lease; the lease itself has not been inspected or independently confirmed by AMD. It does not establish construction progress, completed acquisition, planning approval, secured power, delivery timing or public GPU access. FIT Energy is identified as property owner until a prospective sale closes, not a verified current data-centre owner. Exact campus boundaries and any equivalence to other Mount Carmel or regional projects remain unverified. Publication dates and the dates of Appendices A and B are not established; the drawing date, Drive upload/modified clocks and folder labels are not substituted for them. Before relying on a site, check the township for current application documents, hearing arrangements and decisions, and ask the parties which building, phase and delivery conditions apply.

Operate this site or have better evidence? .

Operator
5C PHL01 Inc. (proposed, applicant disclosure)
Owner
Not stated
Stage
Stage not known

Check the township application and review updates
Source page date not stated. The township links the FIT Energy submission under Plan Updates. This is an official planning-information route, not a booking or compute-availability service. No comment, enquiry or application was submitted.

Linked FIT Energy applicant submission, publicly linked by Mount Carmel Township source articles: Copyright retained; selected attributed basic facts and ordinary links only. Five independently worded, narrowly attributed name/date, locality, disclosed-role and review-process facts from the township page and its linked Appendices A, B and D. Public access is not an open licence. No document text, plans, images, logos, signatures, personal contacts, principal business addresses, parcel inventory, lease terms, capacity or technical designs reproduced. No explicit restriction defeating this precise factual/link use was identified in the inspected material; no endorsement, blanket permission or recurring collection authority asserted. Separate 5C website material is excluded. Reassess newly evidenced applicable restrictions.

Printable community case file

Project Phoenix, Mount Carmel Township data-centre proposal

Record checked 21 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 5 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. The township-linked conditional-use plan drawing 4 is titled Project Phoenix, dated 29 October 2026 and marked not for construction. source
  • Checked statement. Appendix A of FIT Energy's township submission identifies the proposed site in Mount Carmel Township, Northumberland County, Pennsylvania. source
  • Checked statement. Appendix B identifies AMD as the single tenant under an executed lease. This is the applicant's disclosure, not independent confirmation of the lease or operating compute. source
  • Checked statement. Appendix B lists 5C PHL01 Inc. as operator and prospective owner after closing, with FIT Energy USA Inc. retaining ownership until closing and the purchase agreement still under negotiation. source
  • Checked statement. The township says FIT Energy's plans are under review and will follow a conditional-use process including public hearings. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

5 separately recorded source statements. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 21 November 2026. Reported and planned figures are shown as such. Independently reviewed on 21 November 2026: Original-source review of the minimal applicant-attributed roles and township planning status; locality and compiled content separately reviewed before release. Not lease, acquisition, approval, construction, power or available-compute verification.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 21). Project Phoenix, Mount Carmel Township data-centre proposal: capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/5c-mount-carmel-township-proposal

BibTeX
@misc{computefinder_data_centres_5c_mount_carmel_township_proposal,
  title        = {Project Phoenix, Mount Carmel Township data-centre proposal: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/5c-mount-carmel-township-proposal}},
  note         = {Page last checked 21 November 2026. Retrieved 23 November 2026.}
}

Page link: https://computefinder.net/data-centres/5c-mount-carmel-township-proposal. Page last checked 21 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in United States

All detailed records in United States / Same recorded stage in United States

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact