Lake Hawkeye Data, Lansing
Lansing, New York, United States.
Stage not knownUnited States
What we checked
- The Lake Hawkeye project account describes TeraWulf's proposed digital infrastructure campus at the former Cayuga Power Plant property in Lansing, New York. (source)
Proposed campus-level account at the former Cayuga Power Plant property, not an operating facility or available compute offer. Cayuga is a site alias, not a second admitted campus. Current planning determinations, construction milestones, capacity, delivery dates and customer access remain unverified here. TeraWulf is the source-attributed developer brand; legal owner and contracting entity are not established. The source page does not state publication or update dates.
Operate this site or have better evidence? .
- Operator
- TeraWulf
- Owner
- Not stated
- Stage
- Stage not known
Read the Lake Hawkeye Data project account
Source page date not stated. Official project information, not a booking route or verified capacity offer. No enquiry or transaction has been tested.
Linked TeraWulf and Lake Hawkeye Data source articles: Copyright retained; selected basic facts and ordinary links only. One independently worded, attributed identity/locality/purpose fact and ordinary unframed project/source links only. The linked operator privacy policy and investor disclaimer were inspected; no restriction preventing this precise use was identified. No open licence, SEC public-domain status, endorsement or recurring collection grant is asserted. No source prose, images, logos, financial data, capacity or availability reproduced. Reassess newly evidenced applicable restrictions.
Printable community case file
Lake Hawkeye Data, Lansing
Record checked 21 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Stage not known, date not recorded | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Stage not known, with no stage source recorded.
- Checked statement. The Lake Hawkeye project account describes TeraWulf's proposed digital infrastructure campus at the former Cayuga Power Plant property in Lansing, New York. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
1 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Stage
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 21 November 2026. Reported and planned figures are shown as such. Independently reviewed on 21 November 2026: Independent original-source and content-code review of the minimal identity, locality, purpose, official link and source-use limits. Not verification of operation, capacity or available compute.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, November 21). Lake Hawkeye Data, Lansing: capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/terawulf-lake-hawkeye-lansing
BibTeX
@misc{computefinder_data_centres_terawulf_lake_hawkeye_lansing,
title = {Lake Hawkeye Data, Lansing: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/data-centres/terawulf-lake-hawkeye-lansing}},
note = {Page last checked 21 November 2026. Retrieved 23 November 2026.}
}Page link: https://computefinder.net/data-centres/terawulf-lake-hawkeye-lansing. Page last checked 21 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.
Other sites in United States
- Project Phoenix, Mount Carmel Township data-centre proposal
- Google Council Bluffs data centre location
- EdgeCore Reno (Tahoe-Reno Industrial Center)
- Justified Data Campus, Hawesville
- Muskie Data Campus, Grayson
All detailed records in United States / Same recorded stage in United States
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact