ComputeFinder

Data centres / North America / United States

Muskie Data Campus, Grayson

Grayson, Kentucky, United States.

Stage not knownUnited States

What we checked

Campus-level AI and high-performance computing development account, not an available compute offer or a separate building record. Current construction milestones, operating status, capacity, delivery dates and customer access remain unverified here. TeraWulf is the source-attributed developer brand; legal owner and contracting entity are not established. The source page does not state publication or update dates.

Operate this site or have better evidence? .

Operator
TeraWulf
Owner
Not stated
Stage
Stage not known

Read the Muskie Data Campus project account
Source page date not stated. Official project information, not a booking route or verified capacity offer. No enquiry or transaction has been tested.

Linked TeraWulf and Muskie Data Campus source articles: Copyright retained; selected basic facts and ordinary links only. One independently worded, attributed identity/locality/purpose fact and ordinary unframed project/source links only. The linked operator privacy policy and investor disclaimer were inspected; no restriction preventing this precise use was identified. No open licence, SEC public-domain status, endorsement or recurring collection grant is asserted. No source prose, images, logos, financial data, capacity or availability reproduced. Reassess newly evidenced applicable restrictions.

Printable community case file

Muskie Data Campus, Grayson

Record checked 21 November 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Stage not known, date not recordedInspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Stage not known, with no stage source recorded.
  • Checked statement. The Muskie project account identifies a TeraWulf AI and high-performance computing development site in EastPark Industrial Park, Grayson, Kentucky. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

1 of 13 facility fields recorded

1 separately recorded source statement. These are not included in the facility-field count.

1 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 21 November 2026. Reported and planned figures are shown as such. Independently reviewed on 21 November 2026: Independent original-source and content-code review of the minimal identity, locality, purpose, official link and source-use limits. Not verification of operation, capacity or available compute.. Missing facility fields remain unverified. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, November 21). Muskie Data Campus, Grayson: capacity, planning and power. ComputeFinder. Retrieved November 23, 2026, from https://computefinder.net/data-centres/terawulf-muskie-grayson

BibTeX
@misc{computefinder_data_centres_terawulf_muskie_grayson,
  title        = {Muskie Data Campus, Grayson: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/data-centres/terawulf-muskie-grayson}},
  note         = {Page last checked 21 November 2026. Retrieved 23 November 2026.}
}

Page link: https://computefinder.net/data-centres/terawulf-muskie-grayson. Page last checked 21 November 2026. Retrieved 23 November 2026. Cite the provider or the primary source for any fact you rely on.

Other sites in United States

All detailed records in United States / Same recorded stage in United States

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact