141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.

Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.

For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.

Clear filters

Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.

Showing 11 of 141 detailed records.

Matching records by stage

How many of our records sit at each stage. This counts sites, not megawatts.

  1. Stage not known11
Show this chart as a table
Matching records by stage
StageSites
Stage not known11

United Kingdom

United Kingdom
SiteOperatorWhereStageRecord
Ark Cody Park data centre campusArk Data Centres LimitedFarnborough, HampshireStage not known
Stage date not recorded
Checked 10 November 2026
Ark Spring Park data centre campusArk Data Centres LimitedCorsham, WiltshireStage not known
Stage date not recorded
Checked 10 November 2026
COLT Hayes data centreColt Data Centre Services UK LimitedHayes, LondonStage not known
Stage date not recorded
Checked 10 November 2026
Colt Powergate data centreColt Data Centre Services UK LimitedNorth Acton, LondonStage not known
Stage date not recorded
Checked 10 November 2026
Didcot North Data Centre CampusAmazon Data Services UK LimitedDidcot, OxfordshireStage not known
Stage date not recorded
Checked 10 November 2026
Global Switch London North (East India Dock House)Global SwitchDocklands, LondonStage not known
Stage date not recorded
Checked 10 November 2026
LON3 Data CentreIron Mountain (UK) Data Centre LimitedSloughStage not known
Stage date not recorded
Checked 10 November 2026
nLighten London Hoddesdon (STN1)nLightenHoddesdon, HertfordshireStage not known
Stage date not recorded
Checked 10 November 2026
North Weald Airfield data centre campusGoogleNorth Weald Bassett, EssexStage not known
Stage date not recorded
Checked 6 October 2026
Romford North Data CentreGreen Mountain DC UK LimitedRomfordStage not known
Stage date not recorded
Checked 10 November 2026
Swindon Data Centre Back-up Generation FacilityAmazon Data Services UK LimitedSwindonStage not known
Stage date not recorded
Checked 10 November 2026

By region

Browse all regions

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact