Data centres / UK and Ireland / United Kingdom
QTS Cambois Data Centre Campus
Cambois, Blyth, Northumberland, United Kingdom.
PermittedUnited Kingdom
What we checked
- Councillors approved the first phase, which covers the first two of up to ten data centre buildings planned for the Cambois campus. (source)
- The full campus is described as up to 540,000 square metres of floorspace, with about 400 staff forecast once fully operational. (source)
- A government release of 16 September 2025 quotes a regional leader saying the QTS Cambois campus is due to open in 2028, and states that Blackstone has committed 10 billion pounds to the Blyth site. (source)
Council news item dated 2 December 2025 reports approval of phase one; the date shown is the news date, not necessarily the committee date. No MW figure was found in a fetched primary source, so capacity is left empty.
Operate this site or have better evidence? .
- Operator
- QTS
- Owner
- Blackstone
- Stage
- Permitted (source, 2 December 2025)
- Power
- The government press release for the North East AI Growth Zone says the zone as a whole will reach 1.1GW of energy capacity within six years, but it does not say which metric that is or how much belongs to Cambois.
- Cooling
- The council says the scheme will use a closed loop water system.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| First phase approved by Northumberland Strategic Planning Committee: first two of up to ten data centre buildings | Approved | 2 December 2025 |
Printable community case file
QTS Cambois Data Centre Campus
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Permitted, recorded 2 December 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Northumberland planning application search and comment route Checked 5 October 2026. This is the council's general planning participation route. ComputeFinder has not recorded a current Cambois comment deadline. | Use the recorded route for its stated purpose and verify its current status; identify the responsible authority or process separately and do not infer a live window from this record |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Permitted, dated 2 December 2025: stage source
- Decision evidence. First phase approved by Northumberland Strategic Planning Committee: first two of up to ten data centre buildings: Approved, 2 December 2025.
- Checked statement. Councillors approved the first phase, which covers the first two of up to ten data centre buildings planned for the Cambois campus. source
- Checked statement. The full campus is described as up to 540,000 square metres of floorspace, with about 400 staff forecast once fully operational. source
- Checked statement. A government release of 16 September 2025 quotes a regional leader saying the QTS Cambois campus is due to open in 2028, and states that Blackstone has committed 10 billion pounds to the Blyth site. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
6 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). QTS Cambois Data Centre Campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/qts-cambois-blyth
BibTeX
@misc{computefinder_data_centres_qts_cambois_blyth,
title = {QTS Cambois Data Centre Campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0001}},
number = {cf-dc-0001},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0001. Permanent link: https://computefinder.net/entity/cf-dc-0001. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/qts-cambois-blyth. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0001"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
- North Weald Airfield data centre campus
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact