Data centres / UK and Ireland / United Kingdom
Culham AI Growth Zone (UKAEA Culham Campus)
Culham, Oxfordshire, United Kingdom.
AnnouncedUnited Kingdom
What we checked
- The government confirmed on 10 February 2025 that the first AI Growth Zone would be at Culham, Oxfordshire. (source)
- A UKAEA notice on Find a Tender sought third-party interest in a mission-led AI data centre and a funder for future campus development, with an information day on 10 March 2025. (source)
- On 16 March 2026 the government announced 45 million pounds for a 1.4MW supercomputer called Sunrise, described as a first step towards the Culham AI Growth Zone. (source)
Designated as the first AI Growth Zone. UKAEA issued a prior information notice seeking interest in a mission-led AI data centre and an investment partner. No operator, Culham-specific campus MW figure or AI Growth Zone planning reference is recorded here. The Sunrise announcement describes a 1.4MW key first step towards the Growth Zone, but it does not establish permission or delivery of a wider data-centre project.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- UK Atomic Energy Authority
- Stage
- Announced (source, 10 February 2025)
- Power
- Government policy aims to scale each AI Growth Zone to 500MW or more with network operators; no Culham-specific figure was found.
Printable community case file
Culham AI Growth Zone (UKAEA Culham Campus)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Announced, recorded 10 February 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | South Oxfordshire local planning application search route Checked 6 October 2026. The council's register can be searched by reference, address or keywords and allows comments on current applications. No Culham AI Growth Zone application reference or current comment deadline is recorded in this ComputeFinder record. Project descriptions or applicant names may differ, so the missing reference is not evidence that no application exists. Use the register as an official local search route, then confirm which authority or process applies; this general route is not evidence of a live consultation or permission. | Use the recorded route for its stated purpose and verify its current status; identify the responsible authority or process separately and do not infer a live window from this record |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Announced, dated 10 February 2025: stage source
- Checked statement. The government confirmed on 10 February 2025 that the first AI Growth Zone would be at Culham, Oxfordshire. source
- Checked statement. A UKAEA notice on Find a Tender sought third-party interest in a mission-led AI data centre and a funder for future campus development, with an information day on 10 March 2025. source
- Checked statement. On 16 March 2026 the government announced 45 million pounds for a 1.4MW supercomputer called Sunrise, described as a first step towards the Culham AI Growth Zone. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
3 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Operator
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Culham AI Growth Zone (UKAEA Culham Campus): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/culham-ai-growth-zone
BibTeX
@misc{computefinder_data_centres_culham_ai_growth_zone,
title = {Culham AI Growth Zone (UKAEA Culham Campus): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0003}},
number = {cf-dc-0003},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0003. Permanent link: https://computefinder.net/entity/cf-dc-0003. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/culham-ai-growth-zone. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0003"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Nscale Loughton AI Campus
- Google Waltham Cross data centre
- North Weald Airfield data centre campus
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact