- Historical announcement: Nscale and Microsoft announced a commitment on the Loughton campus on 16 September 2025, with 23,040 NVIDIA GB300 GPUs initially, planned for delivery in Q1 2027. Nscale's 12 November 2026 filing below reports that a Microsoft statement of work for the Loughton deployment was terminated; this plan is not treated as current. (source)
- Nscale's earlier release says it bought the Loughton site as its first UK data centre. (source)
- Historical report: a March 2026 trade report said Nscale expected the site to be operational in the second quarter of 2027. This is not treated as a current confirmed readiness date. (source)
- In its amended S-1 (a preliminary prospectus) filed 12 November 2026, Nscale says a Microsoft statement of work for the Loughton deployment was terminated after the local power provider withdrew the scheduled connection date and associated power allocation. Nscale says it remains committed to the project and is exploring alternative power sources; it says other statements of work were unaffected. (source)
The 50MW and 90MW figures are left out of capacity because the operator wording (AI and HPC capacity, power allocation) does not say whether it is IT, facility or grid power. Planning status is reported only and unverified, so stage is kept at announced. Update checked 18 November 2026: the Microsoft deployment described in the 2025 announcement is historical, not treated as a current delivery commitment. Nscale's 12 November 2026 amended S-1 says a Microsoft statement of work associated with the Loughton deployment was terminated, while it remains committed to Loughton and is exploring alternative power. The project is not described here as cancelled. Earlier 2027 targets are not treated as a current confirmed readiness date. This check updates the Microsoft/power account only; the 2 October 2026 checks on other fields are not refreshed.
Operate this site or have better evidence? .
- Operator
- Nscale
- Owner
- Not stated
- Stage
- Announced (source, 16 September 2025)
- Power
- Earlier Nscale announcements described 50MW of AI capacity scalable to 90MW and called 90MW a power allocation. These are historical descriptions, not confirmation of a current secured allocation. In its 12 November 2026 filing, Nscale says the scheduled connection date and associated power allocation for the Loughton Microsoft deployment were withdrawn. The reviewed filing passages do not quantify the withdrawn allocation or relate it to the earlier figures.
- Cooling
- Nscale says the site will use advanced liquid cooling.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| Reported by trade press: outline approval in 2024, with council officers calling for a fresh application over revised plans (not checked at the council portal) | Status not known | Not stated |
Printable community case file
Nscale Loughton AI Campus
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Announced, recorded 16 September 2025 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 4 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Announced, dated 16 September 2025: stage source
- Decision evidence. Reported by trade press: outline approval in 2024, with council officers calling for a fresh application over revised plans (not checked at the council portal): Status not known, date not stated.
- Checked statement. Historical announcement: Nscale and Microsoft announced a commitment on the Loughton campus on 16 September 2025, with 23,040 NVIDIA GB300 GPUs initially, planned for delivery in Q1 2027. Nscale's 12 November 2026 filing below reports that a Microsoft statement of work for the Loughton deployment was terminated; this plan is not treated as current. source
- Checked statement. Nscale's earlier release says it bought the Loughton site as its first UK data centre. source
- Checked statement. Historical report: a March 2026 trade report said Nscale expected the site to be operational in the second quarter of 2027. This is not treated as a current confirmed readiness date. source
- Checked statement. In its amended S-1 (a preliminary prospectus) filed 12 November 2026, Nscale says a Microsoft statement of work for the Loughton deployment was terminated after the local power provider withdrew the scheduled connection date and associated power allocation. Nscale says it remains committed to the project and is exploring alternative power sources; it says other statements of work were unaffected. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
5 of 13 facility fields recorded
4 separately recorded source statements. These are not included in the facility-field count.
5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Nscale Loughton AI Campus: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/nscale-loughton
BibTeX
@misc{computefinder_data_centres_nscale_loughton,
title = {Nscale Loughton AI Campus: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0004}},
number = {cf-dc-0004},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0004. Permanent link: https://computefinder.net/entity/cf-dc-0004. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/nscale-loughton. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0004"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in United Kingdom
- QTS Cambois Data Centre Campus
- Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone)
- Culham AI Growth Zone (UKAEA Culham Campus)
- Google Waltham Cross data centre
- North Weald Airfield data centre campus
All detailed records in United Kingdom / Same recorded stage in United Kingdom
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact