Vantage gives 72MW existing and 148MW of critical IT load once fully developed; both are operator statements on an undated page. Certifications are Vantage corporate listings, not site audits. The Bridgend planning report refers to this as the existing Newport campus.

Operate this site or have better evidence? .

Operator
Vantage Data Centers
Owner
Not stated
Stage
Operating (source, 2 October 2026)
Power
Vantage says a dedicated 400kV substation on campus connects privately to the national grid and that all power into the campus is renewable.
Cooling
Vantage says the climate supports free air cooling for much of the year and cites air-to-air plate heat exchange.
Certifications
ISO 9001, ISO 14001, ISO/IEC 27001, ISO 45001, ISAE 3402, SOC 2

Capacity

Capacity
MeasureStageBasisMWAs ofSource
IT loadOperatingreported722 October 2026source
IT loadAnnouncedreported1482 October 2026source

These figures measure different things and are not added together.

Printable community case file

Vantage Cardiff campus (CWL1, Newport)

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Operating, recorded 2 October 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Operating, dated 2 October 2026: stage source
  • Checked statement. Vantage says three data centres are planned on the 46 acre campus, of which two are operational, for 148MW of critical IT load when complete. source
  • Checked statement. The campus page also cites existing IT capacity of 72MW. source
  • Checked statement. Bridgend council's planning report describes Vantage's existing Newport campus. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

6 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

6 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). Vantage Cardiff campus (CWL1, Newport): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/vantage-cardiff-newport-cwl1

BibTeX
@misc{computefinder_data_centres_vantage_cardiff_newport_cwl1,
  title        = {Vantage Cardiff campus (CWL1, Newport): capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0011}},
  number       = {cf-dc-0011},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0011. Permanent link: https://computefinder.net/entity/cf-dc-0011. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/vantage-cardiff-newport-cwl1. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0011"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in United Kingdom

All detailed records in United Kingdom / Same recorded stage in United Kingdom

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim