ComputeFinder

Data centres / UK and Ireland / United Kingdom

SDC M40 Campus, Wapseys Wood

Wapseys Wood landfill site, Buckinghamshire, United Kingdom.

AnnouncedUnited Kingdom

What we checked

Proposal stage. The 300MW is the applicant's proposed IT load across three buildings of about 100MW each, as recorded in the Secretary of State's direction. The applicant named in the direction is Slough Holdings UK Limited; the end operator is not stated.

Operate this site or have better evidence? .

Operator
Not stated
Owner
Not stated
Stage
Announced (source, 16 March 2026)
Power
The scheme includes an on-site gas energy centre with maximum generating capacity of roughly 250 to 350MW, per the Planning Inspectorate project page.
Cooling
Air cooling is proposed.
Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Chips, Coordinates: Not stated in the inspected source. The selected short official Section35 direction/decision identifies the named proposal and procedure, not a voltage/substation connection, explicit design/target/measured PUE, scoped water measurement/period, chips or official point/CRS. No IT/total-power ratio is converted to PUE; air cooling or a proposed energy centre is not zero-water or a delivered grid connection. No broader planning/EIA/utility audit or whole-application omission is claimed. Scope recorded 1 November 2026; inspected source context. MHCLG / GOV.UK: Crown/source rights retained; no new document-component OGL grant asserted. Only an original selected-official-filing inspection-limit account and ordinary link. No directive/report text, developer evidence, map, contact, capacity figure, narrative adaptation or underlying dataset is imported. A different independent review completed at 2026-11-01T03:10:26.335Z accepts only this original account of the selected two-page official direction and an ordinary link. GOV.UK terms were directly read: ordinary links are encouraged subject to the stated charged-click-through and endorsement limits. General Crown/OGL language is conditional; no new document-component open-licence grant is asserted. No source text, developer evidence, map, contact, technical capacity figure or underlying dataset is imported. The retained National Archives route was not requested.

Capacity

Capacity
MeasureStageBasisMWAs ofSource
IT loadAnnouncedreported30016 March 2026source

These figures measure different things and are not added together.

Planning

Printable community case file

SDC M40 Campus, Wapseys Wood

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 16 March 2026Inspect the stage source and limits
Where is the formal decision evidence?2 planning items recordedCheck the authority's complete file, reference and conditions
How can the public participate?Applicant Stage Two Community Consultation feedback route
Checked 6 October 2026. The applicant says its Stage Two Community Consultation is open from 15 September to 27 October 2026, with written feedback due by 23:59 on 27 October. This is a pre-application feedback route, not Planning Inspectorate registration, an accepted development consent order application or permission.
Use the recorded route for its stated purpose and verify its current status; identify the responsible authority or process separately and do not infer a live window from this record
Which promises became outcomes?Review 4 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

5 of 13 facility fields recorded

4 separately recorded source statements. These are not included in the facility-field count.

5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). SDC M40 Campus, Wapseys Wood: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/wapseys-wood-sdc-m40-campus

BibTeX
@misc{computefinder_data_centres_wapseys_wood_sdc_m40_campus,
  title        = {SDC M40 Campus, Wapseys Wood: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0013}},
  number       = {cf-dc-0013},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0013. Permanent link: https://computefinder.net/entity/cf-dc-0013. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/wapseys-wood-sdc-m40-campus. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0013"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in United Kingdom

All detailed records in United Kingdom / Same recorded stage in United Kingdom

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact