Data centres / Western Europe / Germany
Digital Realty Frankfurt campus (metro cluster)
Frankfurt am Main, Germany.
OperatingGermany
What we checked
- Digital Realty lists 24 Frankfurt-area data centres with about 220,900 sq m of colocation space. (source)
- Campus-specific update checked 18 November 2026: Digital Realty's 17 November release says its dedicated 110kV connection to Digital Park Fechenheim is operational, designed for up to 300MVA of grid connection capacity. This is not an IT-load or current spare-capacity figure for the wider Frankfurt metro cluster. (source)
Cluster record for 24 sites on Hanauer Landstrasse, Weismullerstrasse, Hugo-Junkers-Strasse and Wilhelm-Fay-Strasse. The page gives floor space, not MW. Campus-specific Fechenheim context was checked on 18 November 2026. It does not refresh the older metro-cluster site count, area, stage or certification checks, identify the whole metro cluster with Fechenheim, or combine capacities.
Operate this site or have better evidence? .
- Operator
- Digital Realty
- Owner
- Digital Realty
- Stage
- Operating (source, 2 October 2026)
- Cooling
- The operator page states 2N+1 cooling redundancy across the sites.
- Certifications
- ISO 14001, ISO 27001, ISO 22301, ISO 9001, ISO 50001, PCI-DSS, SOC 1, SOC 2, SOC 3, EN 50600
Printable community case file
Digital Realty Frankfurt campus (metro cluster)
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 2 October 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 2 October 2026: stage source
- Checked statement. Digital Realty lists 24 Frankfurt-area data centres with about 220,900 sq m of colocation space. source
- Checked statement. Campus-specific update checked 18 November 2026: Digital Realty's 17 November release says its dedicated 110kV connection to Digital Park Fechenheim is operational, designed for up to 300MVA of grid connection capacity. This is not an IT-load or current spare-capacity figure for the wider Frankfurt metro cluster. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
5 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
5 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Power source
- Grid connection
- PUE
- Water use
- Chips
- Connectivity
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Digital Realty Frankfurt campus (metro cluster): capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/digital-realty-frankfurt
BibTeX
@misc{computefinder_data_centres_digital_realty_frankfurt,
title = {Digital Realty Frankfurt campus (metro cluster): capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0065}},
number = {cf-dc-0065},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0065. Permanent link: https://computefinder.net/entity/cf-dc-0065. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/digital-realty-frankfurt. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0065"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Germany
- KDO data centre, Oldenburg
- German Climate Computing Centre (DKRZ), Hamburg
- Schwarz Digits Lübbenau data centre
- Telekom Industrial AI Cloud, Munich (Tucherpark)
- JUPITER exascale system, Forschungszentrum Jülich
All detailed records in Germany / Same recorded stage in Germany
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim