162 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 162 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 8 of 162 detailed records.
Matching records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Announced | 8 |
United Kingdom
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Cobalt Park, Wallsend (Stargate UK, North East AI Growth Zone) | Nscale | Wallsend, North Tyneside | Announced Recorded date: 16 September 2025 Checked 2 October 2026 | |
| Culham AI Growth Zone (UKAEA Culham Campus) | Not stated | Culham, Oxfordshire | Announced Recorded date: 10 February 2025 Checked 2 October 2026 | |
| Dartford AI data centre campus, New Barn Road | Not stated | Dartford, Kent | Announced Recorded date: 1 July 2026 Checked 2 October 2026 | |
| Data centre campus, Ampthill Road, Bedford | Not stated | Ampthill Road, Bedford area (Central Bedfordshire) | Announced Recorded date: 15 June 2026 Checked 6 October 2026 | |
| Lanarkshire AI Growth Zone (DataVita, Airdrie) | DataVita | Airdrie and Chapelhall, North Lanarkshire | Announced Recorded date: 29 January 2026 Checked 2 October 2026 | |
| North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd) | Not stated | Anglesey and Gwynedd, North Wales | Announced Recorded date: 13 November 2025 Checked 2 October 2026 | |
| Nscale Loughton AI Campus | Nscale | Loughton, Essex | Announced Recorded date: 16 September 2025 Checked 2 October 2026 | |
| SDC M40 Campus, Wapseys Wood | Not stated | Wapseys Wood landfill site, Buckinghamshire | Announced Recorded date: 16 March 2026 Checked 2 October 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 27 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 15 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim