LUMI-AI AI Factory system, CSC Kajaani

Kajaani, Finland.

AnnouncedFinland

What we checked

A new AI supercomputer for the existing CSC data centre; EuroHPC signed the contract on 31 August 2026 and operation is expected in 2027. No power or cooling figures are disclosed.

Operate this site or have better evidence? .

Operator
CSC (IT Center for Science)
Owner
Not stated
Stage
Announced (source, 31 August 2026)
Chips
  • EuroHPC identifies AMD Instinct MI430X GPUs and sixth-generation AMD EPYC processors for the planned LUMI-AI system.
    Scope: The future LUMI-AI system described in its procurement announcement only. This is not hardware verification for the original LUMI, installed equipment, current operation, awarded access or available compute. The hardware-event date is not separately established.. Stage: Announced. Basis: reported. Evidence: official source. Evidence date: not stated. source. Source version: not established. Source published: 31 August 2026; source updated: not stated; retrieved: not recorded; reviewed: 2026-10-31T22:55:44.727Z; evidence checked: 31 October 2026.
    European Union / European High-Performance Computing Joint Undertaking: CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained. Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported. Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied. Reduced to a short factual hardware identification with separate scope and uncertainty. This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights.

Separate scoped statements, not a whole-site operating or availability claim. Values are not combined across scopes, stages, metrics or sites.

Inspect the limits of this source check

These notes describe a bounded inspection, not a whole planning-application audit. They do not count as recorded facility fields, prove that information does not exist elsewhere or refresh this record's check date.

  • Grid connection, PUE, Water use, Coordinates: Not inspected in this scope. This admission checks the announced LUMI-AI hardware families in one EuroHPC article. Planning, utility, facility-efficiency, water and parcel records were not audited for these unfilled fields. Scope recorded 31 October 2026; inspected source context. European Union / European High-Performance Computing Joint Undertaking: CC BY 4.0 for EU-owned article text only; third-party and industrial-property exclusions retained. Minimal independently worded chip identification from the attributed article and an ordinary unframed source link. Product names are descriptive identifiers only. No copied prose, specification table, performance figure, quantity, logo, image, quotation, mark asset or underlying dataset is imported. Source: European Union / EuroHPC JU; original article linked in source_url. No endorsement is implied. Reduced to a short factual hardware identification with separate scope and uncertainty. This exact new chip-identification use was independently reviewed. It does not extend the earlier directory-use scope or grant recurring acquisition or broader technical-data rights.

Separately recorded system identities

These are separately recorded identities, not aliases. These links are not evidence of shared or separate buildings, campuses or physical phases, upgrades, current operation, available compute or programme eligibility. Each record retains its own evidence date; no capacity is combined.

Printable community case file

LUMI-AI AI Factory system, CSC Kajaani

Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.

Use this record as a shared case file

This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.

Use this record as a shared case file
QuestionWhat this record currently showsUseful next step
What stage is evidenced?Announced, recorded 31 August 2026Inspect the stage source and limits
Where is the formal decision evidence?Not recorded here. First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions
How can the public participate?Not recorded here. Record the official route, deadline, decision-maker and how responses are considered
Which promises became outcomes?Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome.Keep proposed, committed and delivered states separate, with dates and responsible parties

Evidence carried into this printout

  • Recorded stage. Announced, dated 31 August 2026: stage source
  • Checked statement. EuroHPC signed a contract with Bull to deploy LUMI-AI at CSC in Kajaani, with AMD Instinct MI430X GPUs and a total budget of EUR 387.8 million. source
  • Checked statement. Norway's research computing body says it joins LUMI-AI, which is due to enter operation in the second half of 2027. source
  • Checked statement. EuroHPC's first AI Factory selection in December 2024 named the LUMI AI Factory at CSC in Kajaani. source

Named next steps

Next decision and owner:

Participation route and deadline:

Evidence still required:

Review date:

Open the community questions guide

Permanent case-file link

This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.

What we do not know yet

These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.

3 of 13 facility fields recorded

3 separately recorded source statements. These are not included in the facility-field count.

3 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:

Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.

Cite this page

ComputeFinder. (2026, October 2). LUMI-AI AI Factory system, CSC Kajaani: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/lumi-ai-kajaani-csc

BibTeX
@misc{computefinder_data_centres_lumi_ai_kajaani_csc,
  title        = {LUMI-AI AI Factory system, CSC Kajaani: capacity, planning and power},
  author       = {{ComputeFinder}},
  year         = {2026},
  howpublished = {\url{https://computefinder.net/entity/cf-dc-0043}},
  number       = {cf-dc-0043},
  note         = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}

Stable ID: cf-dc-0043. Permanent link: https://computefinder.net/entity/cf-dc-0043. It keeps working if this page moves.

Page link: https://computefinder.net/data-centres/lumi-ai-kajaani-csc. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.

Share this record

Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.

Listed on ComputeFinder

Embed code
<a href="https://computefinder.net/entity/cf-dc-0043"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>

Other sites in Finland

All detailed records in Finland / Same recorded stage in Finland

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact