Data centres / Western Europe / Netherlands
Google Eemshaven data centre
Eemshaven, Groningen, Netherlands.
OperatingNetherlands
What we checked
- Google's 6 December 2016 post says the Eemshaven data centre opened that day and was operational. (source)
- The Dutch parliament's data centre page counts Google at Eemshaven among three existing hyperscale facilities, alongside Microsoft and Google in Wieringermeer. (source)
- In June 2019 Google announced a EUR 500 million Eemshaven expansion and a new Agriport site, with no MW figure given. (source)
Google's 6 December 2016 post says the Eemshaven data centre opened that day. The Tweede Kamer page dated 23 June 2022 provides later historical context, not a current operating check. No MW figure from a primary source; a second phase was reported under way in 2019.
Operate this site or have better evidence? .
- Operator
- Owner
- Stage
- Operating (source, 6 December 2016)
- Power
- A 2019 report says Google buys 100 per cent renewable energy for its Dutch data centres.
Printable community case file
Google Eemshaven data centre
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Operating, recorded 6 December 2016 | Inspect the stage source and limits |
| Where is the formal decision evidence? | Not recorded here. | First identify whether an application exists and which authority or process applies; then inspect its file, reference, status, consultation window, decision and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 3 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Operating, dated 6 December 2016: stage source
- Checked statement. Google's 6 December 2016 post says the Eemshaven data centre opened that day and was operational. source
- Checked statement. The Dutch parliament's data centre page counts Google at Eemshaven among three existing hyperscale facilities, alongside Microsoft and Google in Wieringermeer. source
- Checked statement. In June 2019 Google announced a EUR 500 million Eemshaven expansion and a new Agriport site, with no MW figure given. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
3 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
- Planning reference
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Google Eemshaven data centre: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/google-eemshaven
BibTeX
@misc{computefinder_data_centres_google_eemshaven,
title = {Google Eemshaven data centre: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0052}},
number = {cf-dc-0052},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0052. Permanent link: https://computefinder.net/entity/cf-dc-0052. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/google-eemshaven. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0052"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Netherlands
- Google Middenmeer data centre
- Microsoft Middenmeer data centre
- Groningen AI Factory (Zernike, Eurofiber data centre)
- Meta Zeewolde data centre (cancelled)
- Equinix Amsterdam IBX sites (metro cluster)
All detailed records in Netherlands / Same recorded stage in Netherlands
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact