162 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 162 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 9 of 162 detailed records.
Matching records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Operating | 9 |
United Kingdom
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Digital Realty LHR26 (Slough Trading Estate) | Digital Realty | Slough Trading Estate, Slough | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Equinix LD10 (Slough) | Equinix | Slough, Berkshire | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Google Waltham Cross data centre | Waltham Cross (Theobalds Business Park, Cheshunt), Hertfordshire | Operating Recorded date: 16 September 2025 Checked 2 October 2026 | ||
| Kao Data Harlow campus | Kao Data | Harlow, Essex | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Pure DC LON01 Brent Cross | Pure DC | Brent Cross, London | Operating Recorded date: 3 September 2026 Checked 2 October 2026 | |
| Telehouse London Docklands campus | Telehouse | Docklands, London | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Vantage Cardiff campus (CWL1, Newport) | Vantage Data Centers | Newport, South Wales (Vantage calls it Cardiff) | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Virtus LONDON5 (Stockley Park) | Virtus Data Centres | Stockley Park, Hayes, London | Operating Recorded date: 2 October 2026 Checked 2 October 2026 | |
| Virtus Slough campus | Virtus Data Centres | Slough, Berkshire | Operating Recorded date: 2 October 2026 Checked 2 October 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 27 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 15 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact