Data centres / UK and Ireland / Ireland
Herbata Limited data centre, Naas
Halverstown, Jigginstown and Newhall, Naas, Co. Kildare, Ireland.
AnnouncedIreland
What we checked
- The proposal is for a data centre including demolition works, accompanied by both an environmental impact report and a Natura impact statement. (source)
Proposal stage. The case page still showed a due date of 28 January 2026 and no decision when fetched, so the outcome is unconfirmed. Applicant is Herbata Limited; no operator or MW stated.
Operate this site or have better evidence? .
- Operator
- Not stated
- Owner
- Not stated
- Stage
- Announced (source, 2 October 2026)
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| PL09.323677 (Kildare ref 2460787): data centre with demolition, planning appeal due to be decided by 28 January 2026 | On appeal | Not stated |
Printable community case file
Herbata Limited data centre, Naas
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Announced, recorded 2 October 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 1 checked statement and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Announced, dated 2 October 2026: stage source
- Decision evidence. PL09.323677 (Kildare ref 2460787): data centre with demolition, planning appeal due to be decided by 28 January 2026: On appeal, date not stated.
- Checked statement. The proposal is for a data centre including demolition works, accompanied by both an environmental impact report and a Natura impact statement. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
2 of 13 facility fields recorded
1 separately recorded source statement. These are not included in the facility-field count.
2 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Operator
- Capacity (MW)
- Power source
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Herbata Limited data centre, Naas: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/herbata-naas-data-centre
BibTeX
@misc{computefinder_data_centres_herbata_naas_data_centre,
title = {Herbata Limited data centre, Naas: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0029}},
number = {cf-dc-0029},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0029. Permanent link: https://computefinder.net/entity/cf-dc-0029. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/herbata-naas-data-centre. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0029"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Ireland
- Google Grange Castle DC3
- EdgeConneX DUB06, Ballymakaily, Lucan
- Equinix Profile Park Plot 100
- Vantage Dublin DUB1 (Profile Park)
- Vantage DUB11, Ballybane and Kilbride, Clondalkin
All detailed records in Ireland / Same recorded stage in Ireland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact