Data centres / UK and Ireland / Ireland
Google Grange Castle DC3
Grange Castle Business Park and Profile Park, Baldonnell, Dublin 22, Ireland.
PermittedIreland
What we checked
- An Coimisiun Pleanala granted permission with conditions on 23 September 2026 after a first-party appeal by Google Ireland Limited. (source)
- The proposed DC3 is described in the applicant's environmental report as a data storage facility with eight data halls, south and east of existing DC1 and DC2. (source)
Permission date is the signed order date on An Coimisiun Pleanala's case page. The environmental report states no MW figure, and its floorspace figures are inconsistent, so only the eight-hall description is used.
Operate this site or have better evidence? .
- Operator
- Owner
- Not stated
- Stage
- Permitted (source, 23 September 2026)
- Power
- The applicant's environmental report says emergency generators are in enclosures, with rooftop solar panels expected to cover about 20 percent of the energy need of the occupied building.
Planning
| Decision or document | Status | Date | Review |
|---|---|---|---|
| PL06S.320852 (SD24A/0164W): ten-year permission for expansion including a data storage facility, granted with conditions on appeal | Granted with conditions | 23 September 2026 |
Printable community case file
Google Grange Castle DC3
Record checked 2 October 2026. Prepared from the public ComputeFinder record; follow each cited source before relying on it.
Use this record as a shared case file
This step helps residents, councils and builders move from a project record to the next checkable question. It does not establish local support, opposition, permission beyond the cited decision, or a delivered benefit.
| Question | What this record currently shows | Useful next step |
|---|---|---|
| What stage is evidenced? | Permitted, recorded 23 September 2026 | Inspect the stage source and limits |
| Where is the formal decision evidence? | 1 planning item recorded | Check the authority's complete file, reference and conditions |
| How can the public participate? | Not recorded here. | Record the official route, deadline, decision-maker and how responses are considered |
| Which promises became outcomes? | Review 2 checked statements and mark each as proposal, commitment, permission, construction, operation or delivered outcome. | Keep proposed, committed and delivered states separate, with dates and responsible parties |
Evidence carried into this printout
- Recorded stage. Permitted, dated 23 September 2026: stage source
- Decision evidence. PL06S.320852 (SD24A/0164W): ten-year permission for expansion including a data storage facility, granted with conditions on appeal: Granted with conditions, 23 September 2026.
- Checked statement. An Coimisiun Pleanala granted permission with conditions on 23 September 2026 after a first-party appeal by Google Ireland Limited. source
- Checked statement. The proposed DC3 is described in the applicant's environmental report as a data storage facility with eight data halls, south and east of existing DC1 and DC2. source
Named next steps
Next decision and owner:
Participation route and deadline:
Evidence still required:
Review date:
This is a route into the existing public evidence, not a verified local case study or a substitute for the formal planning file.
What we do not know yet
These facility fields are not recorded here. This does not show that the facility lacks them or that no source exists. A gap means unknown, never zero.
4 of 13 facility fields recorded
2 separately recorded source statements. These are not included in the facility-field count.
4 of 13 facility fields recorded against the existing target. Separately recorded source statements are not counted in this field measure. Still missing:
- Owner
- Capacity (MW)
- Grid connection
- Cooling
- PUE
- Water use
- Chips
- Connectivity
- Certifications
Checked on 2 October 2026. Reported and planned figures are shown as such. Not yet reviewed line by line by a second person. If something is wrong or you know more, tell us.
Cite this page
ComputeFinder. (2026, October 2). Google Grange Castle DC3: capacity, planning and power. ComputeFinder. Retrieved November 20, 2026, from https://computefinder.net/data-centres/google-grange-castle-dc3
BibTeX
@misc{computefinder_data_centres_google_grange_castle_dc3,
title = {Google Grange Castle DC3: capacity, planning and power},
author = {{ComputeFinder}},
year = {2026},
howpublished = {\url{https://computefinder.net/entity/cf-dc-0022}},
number = {cf-dc-0022},
note = {Page last checked 2 October 2026. Retrieved 20 November 2026.}
}Stable ID: cf-dc-0022. Permanent link: https://computefinder.net/entity/cf-dc-0022. It keeps working if this page moves.
Page link: https://computefinder.net/data-centres/google-grange-castle-dc3. Page last checked 2 October 2026. Retrieved 20 November 2026. Cite the provider or the primary source for any fact you rely on.
Share this record
Link to this stable record with a neutral badge. It means the record is listed, not endorsed or ranked.
Embed code
<a href="https://computefinder.net/entity/cf-dc-0022"><img src="https://computefinder.net/listed-on-computefinder.svg" width="210" height="36" alt="Listed on ComputeFinder"></a>Other sites in Ireland
- EdgeConneX DUB06, Ballymakaily, Lucan
- Equinix Profile Park Plot 100
- Vantage Dublin DUB1 (Profile Park)
- Vantage DUB11, Ballybane and Kilbride, Clondalkin
- Cruiserath Road data centre expansion
All detailed records in Ireland / Same recorded stage in Ireland
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact