Data centre records
141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.
Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.
For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.
Related company disclosures
- SpaceX reports 1.7GW of nameplate compute in third-quarter results. Event 20 October 2026. Investigate individual facilities with their own evidence and dates.
Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.
Showing 72 of 141 detailed records.
Records by stage
How many of our records sit at each stage. This counts sites, not megawatts.
Show this chart as a table
| Stage | Sites |
|---|---|
| Operating | 1 |
| Stage not known | 71 |
Angola
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio Angola AO1 | Raxio Group | Outskirts of Luanda | Stage not known Stage date not recorded Checked 12 November 2026 |
Australia
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Gadi (NCI) | Not stated | Not stated | Stage not known Stage date not recorded Checked 17 October 2026 | |
| Pawsey Centre, Kensington, Perth | Not stated | Kensington, Perth | Stage not known Stage date not recorded Checked 14 October 2026 |
Brazil
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| LNCC Santos Dumont hosting location, Petrópolis | Not stated | Petrópolis | Stage not known Stage date not recorded Checked 14 October 2026 |
Bulgaria
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Discoverer (Sofia Tech Park) | Not stated | Sofia | Stage not known Stage date not recorded Checked 17 October 2026 |
Canada
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| McGill-Calcul Québec data centre, Montréal | Not stated | Montréal, Québec | Stage not known Stage date not recorded Checked 14 October 2026 |
Congo - Kinshasa
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio DR Congo DRC1 | Raxio Group | Limete industriel, Kinshasa | Stage not known Stage date not recorded Checked 12 November 2026 |
Côte d’Ivoire
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio Côte d’Ivoire CIV1 | Raxio Group | Grand Bassam, VITIB | Stage not known Stage date not recorded Checked 12 November 2026 |
Czechia
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Karolina (IT4Innovations, Ostrava) | Not stated | Ostrava | Stage not known Stage date not recorded Checked 17 October 2026 |
Ethiopia
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio Ethiopia ET1 | Raxio Group | ICT Park, Addis Ababa | Stage not known Stage date not recorded Checked 12 November 2026 |
Finland
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| LUMI (CSC, Kajaani) | Not stated | Kajaani | Stage not known Stage date not recorded Checked 17 October 2026 |
France
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Alice Recoque (proposed TGCC location) | Not stated | Bruyères-le-Châtel | Stage not known Stage date not recorded Checked 17 October 2026 | |
| Data4 Paris-Saclay campus (PAR01, PAR02, PAR03) | Data4 | Nozay and Marcoussis, Essonne | Stage not known Stage date not recorded Checked 2 October 2026 | |
| Eclairion Bruyères-le-Châtel | Eclairion | Bruyères-le-Châtel, Essonne | Operating Stage date not recorded Checked 6 October 2026 |
Ghana
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| ACR2 Data Centre | Not stated | Accra | Stage not known Stage date not recorded Checked 17 October 2026 | |
| Onix Accra | Onix Data Centres | Amrahia-Katamanso, Accra | Stage not known Stage date not recorded Checked 11 November 2026 | |
| PAIX Accra (ACC-1) | PAIX Data Centres | Accra | Stage not known Stage date not recorded Checked 11 November 2026 |
Greece
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Daedalus (Lavrio) | GRNET | Lavrio | Stage not known Stage date not recorded Checked 21 October 2026 |
India
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| C-DAC Pune National AI Facility (PARAM Siddhi) | Not stated | Pune, Maharashtra | Stage not known Stage date not recorded Checked 14 October 2026 | |
| PARAM Ganga (IIT Roorkee) | Not stated | Roorkee | Stage not known Stage date not recorded Checked 17 October 2026 | |
| PARAM Kamrupa (IIT Guwahati) | Not stated | Guwahati | Stage not known Stage date not recorded Checked 17 October 2026 | |
| PARAM Shivay (IIT(BHU), Varanasi) | Not stated | Varanasi | Stage not known Stage date not recorded Checked 17 October 2026 |
Italy
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Leonardo (CINECA, Bologna) | Not stated | Bologna | Stage not known Stage date not recorded Checked 17 October 2026 |
Japan
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| RIKEN Center for Computational Science, Kobe (Fugaku) | Not stated | Kobe, Hyogo | Stage not known Stage date not recorded Checked 14 October 2026 |
Kenya
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Africa Data Centres NBO1 Nairobi | Africa Data Centres | Nairobi | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty (iColo) Mombasa One (MBA1) | Digital Realty (formerly iColo) | Miritini, Mombasa | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty (iColo) Mombasa Two (MBA2) | Digital Realty (formerly iColo) | Nyali, Mombasa | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty (iColo) Nairobi One (NBO1) | Digital Realty (formerly iColo) | Karen, Nairobi | Stage not known Stage date not recorded Checked 10 November 2026 | |
| iXAfrica NBOX1 Nairobi campus | iXAfrica Data Centre | Cabanas, Mombasa Road, Nairobi | Stage not known Stage date not recorded Checked 10 November 2026 | |
| PAIX Nairobi (NBO-1) | PAIX Data Centres | Upper Hill, Nairobi | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Telkom Kenya Milimani Exchange data centre | Telkom Kenya | Nairobi | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Telkom Kenya Mombasa Telephone House data centre | Telkom Kenya | Mombasa | Stage not known Stage date not recorded Checked 10 November 2026 |
Luxembourg
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| MeluXina (LuxProvide, Bissen) | Not stated | Bissen | Stage not known Stage date not recorded Checked 17 October 2026 |
Malawi
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| National Data Centre, Lilongwe | Not stated | Lilongwe | Stage not known Stage date not recorded Checked 17 October 2026 |
Malaysia
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Bridge Data Centres MY06 | Bridge Data Centres | Sedenak Tech Park, Johor | Stage not known Stage date not recorded Checked 17 October 2026 |
Mozambique
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio Mozambique MZ1 | Raxio Group | Beluluane Industrial Park, Matola | Stage not known Stage date not recorded Checked 12 November 2026 |
Nigeria
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| 21CTL Ikeja data centre | 21st Century Technologies | Ikeja | Stage not known Stage date not recorded Checked 12 November 2026 | |
| 21CTL Ikoyi data centre | 21st Century Technologies | Ikoyi | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Africa Data Centres LOS1 Lagos | Africa Data Centres | Eko Atlantic City, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty Lagos LKK2 (Ogbombo) | Digital Realty | Ogbombo Road, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Digital Realty Lagos LOS1 (Victoria Island) | Digital Realty | Victoria Island, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Galaxy Backbone Kano data centre | Galaxy Backbone Limited | Kano | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Galaxy Backbone NSSC DC1 Abuja | Galaxy Backbone Limited | Abuja | Stage not known Stage date not recorded Checked 12 November 2026 | |
| Open Access Data Centres Lagos (LOS1) | Open Access Data Centres | Lagos; location conflict recorded | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Rack Centre LGS 1 Lagos | Rack Centre | Oregun, Ikeja, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Rack Centre LGS 2 Lagos | Rack Centre | Oregun, Ikeja, Lagos | Stage not known Stage date not recorded Checked 10 November 2026 |
Portugal
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Deucalion (FCT, Guimarães) | Not stated | Guimarães | Stage not known Stage date not recorded Checked 17 October 2026 |
Singapore
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| NSCC Fusionopolis (historical ASPIRE 1 host) | Not stated | Fusionopolis | Stage not known Stage date not recorded Checked 14 October 2026 |
Slovenia
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Vega (IZUM, Maribor) | Not stated | Maribor | Stage not known Stage date not recorded Checked 17 October 2026 |
South Africa
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Africa Data Centres CPT1 Cape Town | Africa Data Centres | Cape Town | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Africa Data Centres JHB1 Midrand | Africa Data Centres | Midrand, Johannesburg | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Africa Data Centres JHB2 Samrand | Africa Data Centres | Samrand, Centurion | Stage not known Stage date not recorded Checked 10 November 2026 | |
| ELIDZ data centre | Not stated | Not stated | Stage not known Stage date not recorded Checked 17 October 2026 |
Spain
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| MareNostrum 5 (BSC, Barcelona) | Not stated | Barcelona | Stage not known Stage date not recorded Checked 17 October 2026 |
Sweden
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Arrhenius (Linköping University campus) | Not stated | Not stated | Stage not known Stage date not recorded Checked 17 October 2026 |
Uganda
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Raxio Uganda UG1 | Raxio Group | Namanve Industrial Park | Stage not known Stage date not recorded Checked 12 November 2026 |
United Arab Emirates
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Moro Hub Green Data Centre (Solar Park) | Not stated | Mohammed bin Rashid Al Maktoum Solar Park | Stage not known Stage date not recorded Checked 15 October 2026 |
United Kingdom
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Ark Cody Park data centre campus | Ark Data Centres Limited | Farnborough, Hampshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Ark Spring Park data centre campus | Ark Data Centres Limited | Corsham, Wiltshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| COLT Hayes data centre | Colt Data Centre Services UK Limited | Hayes, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Colt Powergate data centre | Colt Data Centre Services UK Limited | North Acton, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Didcot North Data Centre Campus | Amazon Data Services UK Limited | Didcot, Oxfordshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Global Switch London North (East India Dock House) | Global Switch | Docklands, London | Stage not known Stage date not recorded Checked 10 November 2026 | |
| LON3 Data Centre | Iron Mountain (UK) Data Centre Limited | Slough | Stage not known Stage date not recorded Checked 10 November 2026 | |
| nLighten London Hoddesdon (STN1) | nLighten | Hoddesdon, Hertfordshire | Stage not known Stage date not recorded Checked 10 November 2026 | |
| North Weald Airfield data centre campus | North Weald Bassett, Essex | Stage not known Stage date not recorded Checked 6 October 2026 | ||
| Romford North Data Centre | Green Mountain DC UK Limited | Romford | Stage not known Stage date not recorded Checked 10 November 2026 | |
| Swindon Data Centre Back-up Generation Facility | Amazon Data Services UK Limited | Swindon | Stage not known Stage date not recorded Checked 10 November 2026 |
United States
| Site | Operator | Where | Stage | Record |
|---|---|---|---|---|
| Argonne Leadership Computing Facility (ALCF) | Not stated | Argonne, Illinois | Stage not known Stage date not recorded Checked 17 October 2026 | |
| Google Council Bluffs data centre location | Council Bluffs, Iowa | Stage not known Stage date not recorded Checked 14 October 2026 | ||
| National Energy Research Scientific Computing Center (NERSC) | Not stated | Berkeley, California | Stage not known Stage date not recorded Checked 17 October 2026 | |
| Oak Ridge Leadership Computing Facility (OLCF) | Not stated | Oak Ridge, Tennessee | Stage not known Stage date not recorded Checked 17 October 2026 |
By region
- UK and Ireland 40 records, 1 frontier AI sites
- Nordics 23 records, 5 frontier AI sites
- Western Europe 24 records, 1 frontier AI sites
- North America 5 records, 77 frontier AI sites
- Asia Pacific 9 records, 8 frontier AI sites
- Middle East 1 records, 1 frontier AI sites
How we label evidence
- Official source the body that made the rule or the data says so
- Two sources agree independent sources match
- One source, not confirmed a single report or claim
- Watching a signal, not shown as a fact