141 data centres and proposed sites, each with the facts we could source and a plain list of what we could not.

Most public data on individual data centres is thin. Capacity, power source and efficiency are often missing, and where they exist they are measured in different ways. So each record shows every figure with its metric (IT load, facility load or grid connection), its stage (announced, permitted, under construction, operating) and its source, and we never add them together. A blank means unknown, not zero.

For the largest AI campuses see frontier AI data centres. To see where this data comes from, and which sources we can and cannot reuse, see data sources.

Clear filters

Filters cover these 141 detailed records. Operating does not mean compute is available to buy. Stage dates and checked dates differ; open each record for its evidence and limits. A field-level view is on the coverage page. Epoch frontier sites are listed separately.

Showing 37 of 141 detailed records.

Records by stage

How many of our records sit at each stage. This counts sites, not megawatts.

  1. Announced6
  2. Permitted3
  3. Stage not known28
Show this chart as a table
Records by stage
StageSites
Announced6
Permitted3
Stage not known28

Australia

Australia
SiteOperatorWhereStageRecord
Gadi (NCI)Not statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026
Pawsey Centre, Kensington, PerthNot statedKensington, PerthStage not known
Stage date not recorded
Checked 14 October 2026

Brazil

Brazil
SiteOperatorWhereStageRecord
LNCC Santos Dumont hosting location, PetrópolisNot statedPetrópolisStage not known
Stage date not recorded
Checked 14 October 2026

Bulgaria

Bulgaria
SiteOperatorWhereStageRecord
Discoverer (Sofia Tech Park)Not statedSofiaStage not known
Stage date not recorded
Checked 17 October 2026

Canada

Canada
SiteOperatorWhereStageRecord
McGill-Calcul Québec data centre, MontréalNot statedMontréal, QuébecStage not known
Stage date not recorded
Checked 14 October 2026

Czechia

Czechia
SiteOperatorWhereStageRecord
Karolina (IT4Innovations, Ostrava)Not statedOstravaStage not known
Stage date not recorded
Checked 17 October 2026

Finland

Finland
SiteOperatorWhereStageRecord
LUMI (CSC, Kajaani)Not statedKajaaniStage not known
Stage date not recorded
Checked 17 October 2026

France

France
SiteOperatorWhereStageRecord
Alice Recoque (proposed TGCC location)Not statedBruyères-le-ChâtelStage not known
Stage date not recorded
Checked 17 October 2026
Campus IA, FoujuNot statedFouju, Seine-et-MarnePermitted
Recorded date: 29 July 2026
Checked 2 October 2026

Ghana

Ghana
SiteOperatorWhereStageRecord
ACR2 Data CentreNot statedAccraStage not known
Stage date not recorded
Checked 17 October 2026

India

India
SiteOperatorWhereStageRecord
C-DAC Pune National AI Facility (PARAM Siddhi)Not statedPune, MaharashtraStage not known
Stage date not recorded
Checked 14 October 2026
PARAM Ganga (IIT Roorkee)Not statedRoorkeeStage not known
Stage date not recorded
Checked 17 October 2026
PARAM Kamrupa (IIT Guwahati)Not statedGuwahatiStage not known
Stage date not recorded
Checked 17 October 2026
PARAM Shivay (IIT(BHU), Varanasi)Not statedVaranasiStage not known
Stage date not recorded
Checked 17 October 2026

Ireland

Ireland
SiteOperatorWhereStageRecord
Cruiserath Road data centre expansionNot statedCruiserath Road, Dublin 15Permitted
Recorded date: 19 December 2025
Checked 2 October 2026
Herbata Limited data centre, NaasNot statedHalverstown, Jigginstown and Newhall, Naas, Co. KildareAnnounced
Recorded date: 2 October 2026
Checked 2 October 2026
Orion Business Park data centre, BallycoolinNot statedNorth-West Business Park, Ballycoolin, Dublin 15Stage not known
Recorded date: 9 April 2026
Checked 2 October 2026

Italy

Italy
SiteOperatorWhereStageRecord
Leonardo (CINECA, Bologna)Not statedBolognaStage not known
Stage date not recorded
Checked 17 October 2026

Japan

Japan
SiteOperatorWhereStageRecord
RIKEN Center for Computational Science, Kobe (Fugaku)Not statedKobe, HyogoStage not known
Stage date not recorded
Checked 14 October 2026

Luxembourg

Luxembourg
SiteOperatorWhereStageRecord
MeluXina (LuxProvide, Bissen)Not statedBissenStage not known
Stage date not recorded
Checked 17 October 2026

Malawi

Malawi
SiteOperatorWhereStageRecord
National Data Centre, LilongweNot statedLilongweStage not known
Stage date not recorded
Checked 17 October 2026

Portugal

Portugal
SiteOperatorWhereStageRecord
Deucalion (FCT, Guimarães)Not statedGuimarãesStage not known
Stage date not recorded
Checked 17 October 2026

Singapore

Singapore
SiteOperatorWhereStageRecord
NSCC Fusionopolis (historical ASPIRE 1 host)Not statedFusionopolisStage not known
Stage date not recorded
Checked 14 October 2026

Slovenia

Slovenia
SiteOperatorWhereStageRecord
Vega (IZUM, Maribor)Not statedMariborStage not known
Stage date not recorded
Checked 17 October 2026

South Africa

South Africa
SiteOperatorWhereStageRecord
ELIDZ data centreNot statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026

Spain

Spain
SiteOperatorWhereStageRecord
MareNostrum 5 (BSC, Barcelona)Not statedBarcelonaStage not known
Stage date not recorded
Checked 17 October 2026

Sweden

Sweden
SiteOperatorWhereStageRecord
Arrhenius (Linköping University campus)Not statedNot statedStage not known
Stage date not recorded
Checked 17 October 2026

United Arab Emirates

United Arab Emirates
SiteOperatorWhereStageRecord
Moro Hub Green Data Centre (Solar Park)Not statedMohammed bin Rashid Al Maktoum Solar ParkStage not known
Stage date not recorded
Checked 15 October 2026

United Kingdom

United Kingdom
SiteOperatorWhereStageRecord
Culham AI Growth Zone (UKAEA Culham Campus)Not statedCulham, OxfordshireAnnounced
Recorded date: 10 February 2025
Checked 2 October 2026
Dartford AI data centre campus, New Barn RoadNot statedDartford, KentAnnounced
Recorded date: 1 July 2026
Checked 2 October 2026
Data centre campus, Ampthill Road, BedfordNot statedAmpthill Road, Bedford area (Central Bedfordshire)Announced
Recorded date: 15 June 2026
Checked 6 October 2026
North Wales AI Growth Zone (Prosperity Parc and Trawsfynydd)Not statedAnglesey and Gwynedd, North WalesAnnounced
Recorded date: 13 November 2025
Checked 2 October 2026
SDC M40 Campus, Wapseys WoodNot statedWapseys Wood landfill site, BuckinghamshireAnnounced
Recorded date: 16 March 2026
Checked 2 October 2026
Teesworks data centre siteNot statedRedcar, TeessidePermitted
Recorded date: 11 August 2025
Checked 2 October 2026

United States

United States
SiteOperatorWhereStageRecord
Argonne Leadership Computing Facility (ALCF)Not statedArgonne, IllinoisStage not known
Stage date not recorded
Checked 17 October 2026
National Energy Research Scientific Computing Center (NERSC)Not statedBerkeley, CaliforniaStage not known
Stage date not recorded
Checked 17 October 2026
Oak Ridge Leadership Computing Facility (OLCF)Not statedOak Ridge, TennesseeStage not known
Stage date not recorded
Checked 17 October 2026

By region

Browse all regions

How we label evidence
  • Official source the body that made the rule or the data says so
  • Two sources agree independent sources match
  • One source, not confirmed a single report or claim
  • Watching a signal, not shown as a fact